NASA-LLIS-0131
Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit
Year: 1992
Abstract: Description of Driving Event:
The environmental control system (ECS) pressure distribution unit pre-operations set-up requires several flexhose connections and leak checks prior to operation. Pressure lines could be misconnected and result in damage to flight hardware or injury to personnel.
The environmental control system (ECS) pressure distribution unit pre-operations set-up requires several flexhose connections and leak checks prior to operation. Pressure lines could be misconnected and result in damage to flight hardware or injury to personnel.
Subject: Configuration Management
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:38:02Z | |
| date available | 2017-09-04T15:38:02Z | |
| date copyright | 09/24/1992 | |
| date issued | 1992 | |
| identifier other | OWYCQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/40062 | |
| description abstract | Description of Driving Event: The environmental control system (ECS) pressure distribution unit pre-operations set-up requires several flexhose connections and leak checks prior to operation. Pressure lines could be misconnected and result in damage to flight hardware or injury to personnel. | |
| language | English | |
| title | NASA-LLIS-0131 | num |
| title | Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1992 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Ground Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | Hardware |