• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0934

Lessons Learned – SSME 0523 Test 902-772 Major Mishap

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2000

Abstract: Description of Driving Event:
Space Shuttle Main Engine (SSME) test 902-772 was conducted Friday, June 16, 2000, on engine 0523 with High Pressure Fuel TurboPump (HPFTP/AT) 8109R1, and High Pressure Oxidizer Turbopump (HPOTP/AT) 8308. The test was prematurely cutoff at 5.2 seconds due a violation of the High Pressure Fuel Turbine (HPFT) temperature limit of 1860 degrees Rankine. The high temperature led to High Pressure Fuel Turbopump turbine damage and the declaration of a type A mishap.
The major objective of this test was to characterize the effects of Chamber Coolant Valve (CCV) position on HPFT temperature. Engine 0523 was in the Block Ia configuration (small throat Main Combustion Chamber) with the exception of the Pratt & Whitney High Pressure Fuel Turbopump. It had previously been tested for 119 starts and 59,278 seconds. It was the fleet leader in both starts and seconds.
Nominal operation was planned for the first 90 seconds of the test. The first indication of abnormal performance occurred 2.7 seconds into the start transient. High Pressure Fuel Turbine temperature measurements in two of the four locations began increasing beyond predictions. Other two measurements remained normal. All other engine performance parameters indicated normal engine operation at this time. The two high measurements reached the 1860 degree limit at 4.04 seconds. At approximately 4.97 seconds, the High Pressure Fuel TurboPump vibration levels increased sharply and engine performance dropped. The HPFT temperature limit was activated at 5.04 seconds and a failure identification (FID) was issued, accompanied by a major component failure (MCF). The control and data simulator (CADS) commanded shutdown. The turbine temperature measurements continued to increase after shutdown, reaching a high of 2165 degrees Rankine.
Post test inspections revealed heat damage to the High Pressure Fuel Turbine. The Fuel Preburner fuel manifold was heavily contaminated with "LOX" tape.
During the assembly of SSME 0523, tape was introduced into the fuel system during some "hands on" process (temporary closure, contamination barrier, unintentional introduction, etc.). The tape contamination went unnoticed and was left in the fuel system during the remainder of assembly and pre-test activities.
On June 16, 2000, Stennis Space Center conducted test 902-772. SSME 0523 was to be tested for a scheduled duration of 210 seconds. At engine start the tape contamination was forced downstream in the fuel system, eventually coming to rest as debris in both the Fuel Preburner (FPB) injector and Oxidizer Preburner (OPB) injector. The amount of debris in the FPB was sufficient to block the fuel inlet holes to several FPB injector elements in a localized area. This blockage caused a localized high mixture ratio area in the preburner without affecting overall engine system performance. Data analysis indicates a localized temperature increase occurred in the vicinity of HPFT DS T CH A measurement and the HPFT DS T measurement at joint KG2dt beginning at approximately 2.7 seconds.
At approximately 4.9 seconds, the localized temperature increase caused melting of the support struts and first stage vanes in the HPFTP/AT. The melting of the turbine stator caused local structural failure. The liberated material continued down the hot gas flow stream, impacting the first stage blades, causing the first stage blades to fail due to impact. This caused significant HPF turbopump imbalance. Data analysis indicates synchronous vibrational level increases of approximately 8 Grms on the pump end and 20 Grms on the turbine end. The levels continue to increase with the increase of imbalance of the turbopump; eventually reaching approximately 16 Grms on the pump end and 83 Grms on the turbine end. At 5.04 seconds, the HPFT DS T Launch Commit Criteria (LCC) was activated. At 5.08 seconds, 2 Failure Identifications (FID's) were issued indicating that HPFT DS T CH A2 and HPFT DS T CH A3 had exceeded the 1860 degree Rankine redline. These FID's were accompanied by a Major Component Failure (MCF) indication. The Facility Command and Data Simulator (CADS) was set to respond to an MCF indication before 6.6 seconds with a command to perform engine shutdown. The CADS unit issued a shutdown command and the engine entered shutdown phase at 5.18 seconds. The engine powered down nominally with the exception of the HPFTP. Its spindown was much faster than nominal. It stopped at approximately 4 seconds after shutdown (expected for a pump with severe imbalance).
URI: https://yse.yabesh.ir/std/handle/yse/44434
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (18.54Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0934

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:42:04Z
date available2017-09-04T15:42:04Z
date copyright06/16/2000
date issued2000
identifier otherBAUEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/44434
description abstractDescription of Driving Event:
Space Shuttle Main Engine (SSME) test 902-772 was conducted Friday, June 16, 2000, on engine 0523 with High Pressure Fuel TurboPump (HPFTP/AT) 8109R1, and High Pressure Oxidizer Turbopump (HPOTP/AT) 8308. The test was prematurely cutoff at 5.2 seconds due a violation of the High Pressure Fuel Turbine (HPFT) temperature limit of 1860 degrees Rankine. The high temperature led to High Pressure Fuel Turbopump turbine damage and the declaration of a type A mishap.
The major objective of this test was to characterize the effects of Chamber Coolant Valve (CCV) position on HPFT temperature. Engine 0523 was in the Block Ia configuration (small throat Main Combustion Chamber) with the exception of the Pratt & Whitney High Pressure Fuel Turbopump. It had previously been tested for 119 starts and 59,278 seconds. It was the fleet leader in both starts and seconds.
Nominal operation was planned for the first 90 seconds of the test. The first indication of abnormal performance occurred 2.7 seconds into the start transient. High Pressure Fuel Turbine temperature measurements in two of the four locations began increasing beyond predictions. Other two measurements remained normal. All other engine performance parameters indicated normal engine operation at this time. The two high measurements reached the 1860 degree limit at 4.04 seconds. At approximately 4.97 seconds, the High Pressure Fuel TurboPump vibration levels increased sharply and engine performance dropped. The HPFT temperature limit was activated at 5.04 seconds and a failure identification (FID) was issued, accompanied by a major component failure (MCF). The control and data simulator (CADS) commanded shutdown. The turbine temperature measurements continued to increase after shutdown, reaching a high of 2165 degrees Rankine.
Post test inspections revealed heat damage to the High Pressure Fuel Turbine. The Fuel Preburner fuel manifold was heavily contaminated with "LOX" tape.
During the assembly of SSME 0523, tape was introduced into the fuel system during some "hands on" process (temporary closure, contamination barrier, unintentional introduction, etc.). The tape contamination went unnoticed and was left in the fuel system during the remainder of assembly and pre-test activities.
On June 16, 2000, Stennis Space Center conducted test 902-772. SSME 0523 was to be tested for a scheduled duration of 210 seconds. At engine start the tape contamination was forced downstream in the fuel system, eventually coming to rest as debris in both the Fuel Preburner (FPB) injector and Oxidizer Preburner (OPB) injector. The amount of debris in the FPB was sufficient to block the fuel inlet holes to several FPB injector elements in a localized area. This blockage caused a localized high mixture ratio area in the preburner without affecting overall engine system performance. Data analysis indicates a localized temperature increase occurred in the vicinity of HPFT DS T CH A measurement and the HPFT DS T measurement at joint KG2dt beginning at approximately 2.7 seconds.
At approximately 4.9 seconds, the localized temperature increase caused melting of the support struts and first stage vanes in the HPFTP/AT. The melting of the turbine stator caused local structural failure. The liberated material continued down the hot gas flow stream, impacting the first stage blades, causing the first stage blades to fail due to impact. This caused significant HPF turbopump imbalance. Data analysis indicates synchronous vibrational level increases of approximately 8 Grms on the pump end and 20 Grms on the turbine end. The levels continue to increase with the increase of imbalance of the turbopump; eventually reaching approximately 16 Grms on the pump end and 83 Grms on the turbine end. At 5.04 seconds, the HPFT DS T Launch Commit Criteria (LCC) was activated. At 5.08 seconds, 2 Failure Identifications (FID's) were issued indicating that HPFT DS T CH A2 and HPFT DS T CH A3 had exceeded the 1860 degree Rankine redline. These FID's were accompanied by a Major Component Failure (MCF) indication. The Facility Command and Data Simulator (CADS) was set to respond to an MCF indication before 6.6 seconds with a command to perform engine shutdown. The CADS unit issued a shutdown command and the engine entered shutdown phase at 5.18 seconds. The engine powered down nominally with the exception of the HPFTP. Its spindown was much faster than nominal. It stopped at approximately 4 seconds after shutdown (expected for a pump with severe imbalance).
languageEnglish
titleNASA-LLIS-0934num
titleLessons Learned – SSME 0523 Test 902-772 Major Mishapen
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsFacilities
subject keywordsHardware
subject keywordsMishap Reporting
subject keywordsSafety & Mission Assurance
subject keywordsSpacecraft
subject keywordsTest & Verification
subject keywordsTest Article
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian