NASA-LLIS-3760
Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:42:51Z | |
| date available | 2017-09-04T15:42:51Z | |
| date copyright | 03/04/2011 | |
| date issued | 2011 | |
| identifier other | PKHOEEAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/45035 | |
| description abstract | Abstract: When processing a space vehicle for launch, the test team needs to know how the vehicle's interconnecting hardware is configured just before a test begins. A cable disconnected in one system for troubleshooting can inadvertently affect another system—one under test. This has happened multiple times over the life of the Shuttle Program. An onboard system that can rapidly and accurately determine the configuration of interconnecting hardware and is capable of including all electrical interconnections would provide the pretest visibility required by the test team. | |
| language | English | |
| title | NASA-LLIS-3760 | num |
| title | Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2011 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Engineering design and project processes and standards | |
| subject keywords | Ground processing and manifesting | |
| subject keywords | Ground support systems | |
| subject keywords | Launch support systems | |
| subject keywords | Launch Systems | |
| subject keywords | Level II/III requirements definition | |
| subject keywords | Long term sustainability and maintenance planning |

درباره ما