• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3760

Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: Abstract:
When processing a space vehicle for launch, the test team needs to know how the vehicle's interconnecting hardware is configured just before a test begins. A cable disconnected in one system for troubleshooting can inadvertently affect another system—one under test. This has happened multiple times over the life of the Shuttle Program. An onboard system that can rapidly and accurately determine the configuration of interconnecting hardware and is capable of including all electrical interconnections would provide the pretest visibility required by the test team.
URI: https://yse.yabesh.ir/std/handle/yse/45035
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (86.94Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3760

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:42:51Z
date available2017-09-04T15:42:51Z
date copyright03/04/2011
date issued2011
identifier otherPKHOEEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/45035
description abstractAbstract:
When processing a space vehicle for launch, the test team needs to know how the vehicle's interconnecting hardware is configured just before a test begins. A cable disconnected in one system for troubleshooting can inadvertently affect another system—one under test. This has happened multiple times over the life of the Shuttle Program. An onboard system that can rapidly and accurately determine the configuration of interconnecting hardware and is capable of including all electrical interconnections would provide the pretest visibility required by the test team.
languageEnglish
titleNASA-LLIS-3760num
titleLessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Statusen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsEngineering design and project processes and standards
subject keywordsGround processing and manifesting
subject keywordsGround support systems
subject keywordsLaunch support systems
subject keywordsLaunch Systems
subject keywordsLevel II/III requirements definition
subject keywordsLong term sustainability and maintenance planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian