MSFC-SPEC-2948 VOL 5 CHG NOTICE 3
UTILIZATION DEVELOPMENT CAPABILITY (UDC) SOFTWARE REQUIREMENTS SPECIFICATION (SRS) COMMAND AND DATA HANDLING (C&DH) SYSTEM, VOLUME 5 AUTOMATED PAYLOAD SWITCH (APS) SIMULATOR MISSION OPERATIONS LABORATORY
Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 1999
Abstract: This document is identified as MSFC-SPEC-2948 Volume 5, the Command and Data Handling (C&DH) Software Requirements Specification (SRS) for the Utilization Development Capability (UDC), Automated Payload Switch (APS). The C&DH SRS for the UDC is being developed in several volumes. Volume 1 is a top-level document that contains requirements and information needed for the overall simulation of the C&DH system. The remaining volumes correspond to the major components of the C&DH system, with Volume 2 describing the simulation of the C&C MDM, Volume 3 the Payload Multiplexer/Demultiplexer (PL MDM), Volume 4 the Payload Ethernet Gub/Gateway (PEGH), and Volume 5 the APS. This specification establishes the operations, design, and development requirements for the International Space Station (ISS) C&DH subsystem simulation model that will execute in the UDC Host Computer System (HCS) to support the ISS Ground Support Personnel (GSP) Training. It was prepared and will be maintained in accordance with the MIL-STD-498, which is a merger of DOD-STD-2167A and DOD-STD-7935A, and defines a set of activities and documentation suitable for the development of the C&DH simulation.
Collections
:
-
Statistics
MSFC-SPEC-2948 VOL 5 CHG NOTICE 3
Show full item record
| contributor author | MSFC - NASA - MSFC - Marshall Space Flight Center | |
| date accessioned | 2017-09-04T15:47:02Z | |
| date available | 2017-09-04T15:47:02Z | |
| date copyright | 07/13/1999 | |
| date issued | 1999 | |
| identifier other | PWYHFBAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/49789 | |
| description abstract | This document is identified as MSFC-SPEC-2948 Volume 5, the Command and Data Handling (C&DH) Software Requirements Specification (SRS) for the Utilization Development Capability (UDC), Automated Payload Switch (APS). The C&DH SRS for the UDC is being developed in several volumes. Volume 1 is a top-level document that contains requirements and information needed for the overall simulation of the C&DH system. The remaining volumes correspond to the major components of the C&DH system, with Volume 2 describing the simulation of the C&C MDM, Volume 3 the Payload Multiplexer/Demultiplexer (PL MDM), Volume 4 the Payload Ethernet Gub/Gateway (PEGH), and Volume 5 the APS. This specification establishes the operations, design, and development requirements for the International Space Station (ISS) C&DH subsystem simulation model that will execute in the UDC Host Computer System (HCS) to support the ISS Ground Support Personnel (GSP) Training. It was prepared and will be maintained in accordance with the MIL-STD-498, which is a merger of DOD-STD-2167A and DOD-STD-7935A, and defines a set of activities and documentation suitable for the development of the C&DH simulation. | |
| language | English | |
| title | MSFC-SPEC-2948 VOL 5 CHG NOTICE 3 | num |
| title | UTILIZATION DEVELOPMENT CAPABILITY (UDC) SOFTWARE REQUIREMENTS SPECIFICATION (SRS) COMMAND AND DATA HANDLING (C&DH) SYSTEM, VOLUME 5 AUTOMATED PAYLOAD SWITCH (APS) SIMULATOR MISSION OPERATIONS LABORATORY | en |
| type | standard | |
| page | 29 | |
| status | Active | |
| tree | MSFC - NASA - MSFC - Marshall Space Flight Center:;1999 | |
| contenttype | fulltext |

درباره ما