NASA-LLIS-3197
Lessons Learned - Proof-Load Testing of Ground Support Equipment (GSE) Platforms, Slings, and Handling Fixtures Versus Rated Load Testing
Year: 2010
Abstract: Abstract:
For many years Ground Support Equipment (GSE) was periodically proof loaded based on NSTS 08171, Operations and Maintenance Requirements and Specifications Documents (OMRSDs) File VI requirements. This caused premature wear of components, decreased safety, and increased time to perform maintenance. Reliability Centered Maintenance (RCM) methodology was used to determine optimum maintenance tactics for GSE and flight assets.
For many years Ground Support Equipment (GSE) was periodically proof loaded based on NSTS 08171, Operations and Maintenance Requirements and Specifications Documents (OMRSDs) File VI requirements. This caused premature wear of components, decreased safety, and increased time to perform maintenance. Reliability Centered Maintenance (RCM) methodology was used to determine optimum maintenance tactics for GSE and flight assets.
Subject: Configuration control and data management
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:48:54Z | |
| date available | 2017-09-04T15:48:54Z | |
| date copyright | 05/26/2010 | |
| date issued | 2010 | |
| identifier other | QCMGFDAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/51856 | |
| description abstract | Abstract: For many years Ground Support Equipment (GSE) was periodically proof loaded based on NSTS 08171, Operations and Maintenance Requirements and Specifications Documents (OMRSDs) File VI requirements. This caused premature wear of components, decreased safety, and increased time to perform maintenance. Reliability Centered Maintenance (RCM) methodology was used to determine optimum maintenance tactics for GSE and flight assets. | |
| language | English | |
| title | NASA-LLIS-3197 | num |
| title | Lessons Learned - Proof-Load Testing of Ground Support Equipment (GSE) Platforms, Slings, and Handling Fixtures Versus Rated Load Testing | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2010 | |
| contenttype | fulltext | |
| subject keywords | Configuration control and data management | |
| subject keywords | Early requirements and standards definition | |
| subject keywords | Engineering design and project processes and standards | |
| subject keywords | Ground processing and manifesting | |
| subject keywords | Long term sustainability and maintenance planning | |
| subject keywords | Maintenance | |
| subject keywords | Planning of requirements verification processes |

درباره ما