• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0988

Lessons Learned - Ordinance/Firing Line Misconnect

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2001

Abstract: Description of Driving Event:
At KSC, during performance of Space Shuttle external tank/solid rocket booster thrust post ordinance installation in the booster forward skirt, the frustrum separation cable was mistakenly connected. The job was to install ordinance components in flight hardware. There were three NASA Standard Initiators (NSI) to install, and cables to connect to two of the NSIs. The work team, consisting of three team members, did this work correctly. Then one of the team members noticed the third NSI did not have the cable connected and asked a question about the connection. The work team then connected, in error, the third cable. A problem report was written and the mistakenly connected cable was disconnected and safed.
URI: https://yse.yabesh.ir/std/handle/yse/52341
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.52Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0988

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:49:23Z
date available2017-09-04T15:49:23Z
date copyright01/01/2001
date issued2001
identifier otherQDUEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/52341
description abstractDescription of Driving Event:
At KSC, during performance of Space Shuttle external tank/solid rocket booster thrust post ordinance installation in the booster forward skirt, the frustrum separation cable was mistakenly connected. The job was to install ordinance components in flight hardware. There were three NASA Standard Initiators (NSI) to install, and cables to connect to two of the NSIs. The work team, consisting of three team members, did this work correctly. Then one of the team members noticed the third NSI did not have the cable connected and asked a question about the connection. The work team then connected, in error, the third cable. A problem report was written and the mistakenly connected cable was disconnected and safed.
languageEnglish
titleNASA-LLIS-0988num
titleLessons Learned - Ordinance/Firing Line Misconnecten
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2001
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsExplosives Handling
subject keywordsFlight Equipment
subject keywordsFlight Operations
subject keywordsGround Operations
subject keywordsSpacecraft
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian