• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0061

Lessons Learned - Crane Load Cell System

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
On November 8, 1985, the forward center segment of a solid rocket motor (SRM) was damaged during forward handling ring removal operations. During the operation leading to this incident, the crane operator was attempting to raise the hook until a load of 11,000 pounds was attained, but the load cell read zero until the segmented ring fractured and the crane was stopped. The load cell system was provided with the crane, but the requirement for its usage is not clear. Loadcell usage is not mentioned in the crane OMRSD nor is it mentioned in the system assurance analysis (SAA).
URI: https://yse.yabesh.ir/std/handle/yse/53502
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.95Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0061

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:50:23Z
date available2017-09-04T15:50:23Z
date copyright03/02/1992
date issued1992
identifier otherQGYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/53502
description abstractDescription of Driving Event:
On November 8, 1985, the forward center segment of a solid rocket motor (SRM) was damaged during forward handling ring removal operations. During the operation leading to this incident, the crane operator was attempting to raise the hook until a load of 11,000 pounds was attained, but the load cell read zero until the segmented ring fractured and the crane was stopped. The load cell system was provided with the crane, but the requirement for its usage is not clear. Loadcell usage is not mentioned in the crane OMRSD nor is it mentioned in the system assurance analysis (SAA).
languageEnglish
titleNASA-LLIS-0061num
titleLessons Learned - Crane Load Cell Systemen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsHardware
subject keywordsLaunch Process
subject keywordsLifting Devices
subject keywordsPackaging Handling Storage
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian