• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API RP 19G9

Design, Operation, and Troubleshooting of Dual Gas-lift Wells - SECOND EDITION

Organization:
API - American Petroleum Institute
Year: 2015

Abstract: This document provides recommended practices (RPs) for the selection, design, operation, surveillance, optimization, automation, and troubleshooting of dual gas-lift wells.
The purpose of this document is to present RPs, guidelines, and tools to help obtain optimum production from dual gas-lift wells. This document also contains practices that should be avoided to minimize problems and inefficiencies that can be associated with ineffective dual gas-lift operations. Compared to single completions, dual completions typically have more operating problems, are more difficult to work over, and can produce less efficiently.
It is not the purpose of this document to recommend the practice of dual gas-lift. In some cases, dual gas-lift is problematic and often ineffective. Often it is difficult or even impossible to effectively produce both completions in a dual well using gas-lift over the long term. Where there are other feasible alternatives to produce dual wells, they should be considered. However, many dually completed oil wells should be artificially lifted initially or after reservoir pressures have declined and/or water cuts have increased. In many cases, the only practical method of artificial lift for these wells is gas-lift. Therefore, every effort should be made to design and operate dual gas-lift systems as effectively as possible.
Annexes to this RP include:
a) an overview of dual gas-lift systems,
b) dual gas-lift mandrel spacing designs,
c) dual gas-lift unloading valve design for production pressure operated (PPO) valves, and
d) dual gas-lift practices not recommended.
URI: https://yse.yabesh.ir/std/handle/yse/55621
Collections :
  • API - American Petroleum Institute
  • Download PDF : (1002.Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API RP 19G9

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T15:52:19Z
date available2017-09-04T15:52:19Z
date copyright2015.04.01
date issued2015
identifier otherQMPIKFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/55621
description abstractThis document provides recommended practices (RPs) for the selection, design, operation, surveillance, optimization, automation, and troubleshooting of dual gas-lift wells.
The purpose of this document is to present RPs, guidelines, and tools to help obtain optimum production from dual gas-lift wells. This document also contains practices that should be avoided to minimize problems and inefficiencies that can be associated with ineffective dual gas-lift operations. Compared to single completions, dual completions typically have more operating problems, are more difficult to work over, and can produce less efficiently.
It is not the purpose of this document to recommend the practice of dual gas-lift. In some cases, dual gas-lift is problematic and often ineffective. Often it is difficult or even impossible to effectively produce both completions in a dual well using gas-lift over the long term. Where there are other feasible alternatives to produce dual wells, they should be considered. However, many dually completed oil wells should be artificially lifted initially or after reservoir pressures have declined and/or water cuts have increased. In many cases, the only practical method of artificial lift for these wells is gas-lift. Therefore, every effort should be made to design and operate dual gas-lift systems as effectively as possible.
Annexes to this RP include:
a) an overview of dual gas-lift systems,
b) dual gas-lift mandrel spacing designs,
c) dual gas-lift unloading valve design for production pressure operated (PPO) valves, and
d) dual gas-lift practices not recommended.
languageEnglish
titleAPI RP 19G9num
titleDesign, Operation, and Troubleshooting of Dual Gas-lift Wells - SECOND EDITIONen
typestandard
page98
statusActive
treeAPI - American Petroleum Institute:;2015
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian