• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA MPR 7123.1

MSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTS

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2009

Abstract: PURPOSE
This Marshall Procedural Requirements (MPR) document implements the Agency Systems Engineering Management requirements documented in NASA Procedural Requirements (NPR) 7123.1. The NPR mandates seventeen (17) processes to be used for consistency in Systems Engineering (SE) throughout the Agency. These processes focus on defining stakeholder expectations and implementing a systematic approach for satisfying those expectations. The processes are extracted from industry, national, international, and Agency standards. These processes provide the best typical practices currently available. The processes and concepts are not new, but the context and terminology may be unfamiliar.
The implementation plan of system engineering requirements at Marshall Space Flight Center (MSFC) was submitted and approved in August 2006. The MSFC Systems Engineering requirements can be summarized in four simple statements:
Every Program/Project/Activity shall have a Systems Engineering Management Plan (SEMP);
A SEMP shall contain the mandatory sections outlined and annotated in Appendix A of this MPR;
Every SEMP shall be approved by a Designated Governing Authority (DGA) as defined by Appendix B of this MPR; and
The Engineering Line Management shall ensure compliance with the approved SEMP.
All additional requirements and information in this MPR provide amplification on these four requirement statements.
APPLICABILITY
This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFC's Michoud Assembly Facility, including contractors and resident agencies to the extent specified in their respective contracts or agreements. ("Contractors," for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.)
Applying the common technical processes and reviews may also benefit Basic and Applied Research (BAR) and Advanced Technology Development (ATD) projects. The processes in this MPR and the reviews detailed in MPR 7123.2 are recommended but not required for BAR and ATD projects.
URI: https://yse.yabesh.ir/std/handle/yse/57618
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (146.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA MPR 7123.1

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T15:54:19Z
date available2017-09-04T15:54:19Z
date copyright07/10/2009
date issued2009
identifier otherQRTVMCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/57618
description abstractPURPOSE
This Marshall Procedural Requirements (MPR) document implements the Agency Systems Engineering Management requirements documented in NASA Procedural Requirements (NPR) 7123.1. The NPR mandates seventeen (17) processes to be used for consistency in Systems Engineering (SE) throughout the Agency. These processes focus on defining stakeholder expectations and implementing a systematic approach for satisfying those expectations. The processes are extracted from industry, national, international, and Agency standards. These processes provide the best typical practices currently available. The processes and concepts are not new, but the context and terminology may be unfamiliar.
The implementation plan of system engineering requirements at Marshall Space Flight Center (MSFC) was submitted and approved in August 2006. The MSFC Systems Engineering requirements can be summarized in four simple statements:
Every Program/Project/Activity shall have a Systems Engineering Management Plan (SEMP);
A SEMP shall contain the mandatory sections outlined and annotated in Appendix A of this MPR;
Every SEMP shall be approved by a Designated Governing Authority (DGA) as defined by Appendix B of this MPR; and
The Engineering Line Management shall ensure compliance with the approved SEMP.
All additional requirements and information in this MPR provide amplification on these four requirement statements.
APPLICABILITY
This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFC's Michoud Assembly Facility, including contractors and resident agencies to the extent specified in their respective contracts or agreements. ("Contractors," for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.)
Applying the common technical processes and reviews may also benefit Basic and Applied Research (BAR) and Advanced Technology Development (ATD) projects. The processes in this MPR and the reviews detailed in MPR 7123.2 are recommended but not required for BAR and ATD projects.
languageEnglish
titleNASA MPR 7123.1num
titleMSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTSen
typestandard
page36
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2009
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian