• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1230

Lessons Learned - Welds Near Tube Bends

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1999

Abstract: Description of Driving Event:
During dimensional inspection of orbital tube welds involving 316L tubing, it was found that 8 of 8 welds failed because of weld mismatch. The weld joints were located between two bends that formed a "S" bend. There was approximately 1 inch of straight tubing from each bend to the joint of the weld. The mismatch in this case is not to exceed 25% or 0.010 inch which ever is less.
Root cause: Tube bending / shaping typically causes the tube to take an oval shape, creating matching problems during weld fitting. Engineering drawings provided insufficient length for oval / runout to occur of the shaped / bent tube prior to welding of the joint.
URI: https://yse.yabesh.ir/std/handle/yse/63758
Subject: Hardware
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.15Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1230

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:00:35Z
date available2017-09-04T16:00:35Z
date copyright01/21/1999
date issued1999
identifier otherRIVEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/63758
description abstractDescription of Driving Event:
During dimensional inspection of orbital tube welds involving 316L tubing, it was found that 8 of 8 welds failed because of weld mismatch. The weld joints were located between two bends that formed a "S" bend. There was approximately 1 inch of straight tubing from each bend to the joint of the weld. The mismatch in this case is not to exceed 25% or 0.010 inch which ever is less.
Root cause: Tube bending / shaping typically causes the tube to take an oval shape, creating matching problems during weld fitting. Engineering drawings provided insufficient length for oval / runout to occur of the shaped / bent tube prior to welding of the joint.
languageEnglish
titleNASA-LLIS-1230num
titleLessons Learned - Welds Near Tube Bendsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1999
contenttypefulltext
subject keywordsHardware
subject keywordsIndustrial Operations
subject keywordsNASA Standards
subject keywordsParts Materials & Processes
subject keywordsSafety & Mission Assurance
subject keywordsStandard
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian