• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1252

Lessons Learned - Total Program Statement of Work (SOW) Process

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1998

Abstract: Description of Driving Event:
Since the award of the Basic Space Station Contract numerous changes have been authorized, but there was no consistent, established method of authorizing and notifying the other Space Station locations of their respective changes. The result was that each sites' assigned work, when added together, did not equal the total work required by the program at any particular point in time.
Root cause: a process was never defined (or effectively implemented) to reconcile the work of the decentralized work sites with the entire program.
URI: https://yse.yabesh.ir/std/handle/yse/64932
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.38Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1252

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:01:43Z
date available2017-09-04T16:01:43Z
date copyright36141
date issued1998
identifier otherRLVEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/64932
description abstractDescription of Driving Event:
Since the award of the Basic Space Station Contract numerous changes have been authorized, but there was no consistent, established method of authorizing and notifying the other Space Station locations of their respective changes. The result was that each sites' assigned work, when added together, did not equal the total work required by the program at any particular point in time.
Root cause: a process was never defined (or effectively implemented) to reconcile the work of the decentralized work sites with the entire program.
languageEnglish
titleNASA-LLIS-1252num
titleLessons Learned - Total Program Statement of Work (SOW) Processen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1998
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsConfiguration Management
subject keywordsIndependent Verification and Validation
subject keywordsPolicy & Planning
subject keywordsProcurement Small Business & Industrial Relations
subject keywordsRisk Management/Assessment
subject keywordsSafety & Mission Assurance
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian