Lessons Learned – Orbiting Carbon Observatory (OCO) Launch Vehicle Mishap Investigation Results
Year: 2009
Abstract: Abstract:
The February 2009 OCO mission failed to attain orbit aboard a Taurus launch vehicle, and the OCO satellite payload was lost. A mishap investigation board identified four potential causes that could have led to the failure: (1) failure of the Frangible Joint Subsystem, (2) insufficient electrical current to initiate the ordnance devices, (3) insufficient pressure supplied by the fairing pneumatic system, and (4) snagging of the Flexible Confined Detonating Cord. The board provided 11 related recommendations.
The February 2009 OCO mission failed to attain orbit aboard a Taurus launch vehicle, and the OCO satellite payload was lost. A mishap investigation board identified four potential causes that could have led to the failure: (1) failure of the Frangible Joint Subsystem, (2) insufficient electrical current to initiate the ordnance devices, (3) insufficient pressure supplied by the fairing pneumatic system, and (4) snagging of the Flexible Confined Detonating Cord. The board provided 11 related recommendations.
Subject: Additional Categories.
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:03:48Z | |
| date available | 2017-09-04T16:03:48Z | |
| date copyright | 40127 | |
| date issued | 2009 | |
| identifier other | RRNFQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/67099 | |
| description abstract | Abstract: The February 2009 OCO mission failed to attain orbit aboard a Taurus launch vehicle, and the OCO satellite payload was lost. A mishap investigation board identified four potential causes that could have led to the failure: (1) failure of the Frangible Joint Subsystem, (2) insufficient electrical current to initiate the ordnance devices, (3) insufficient pressure supplied by the fairing pneumatic system, and (4) snagging of the Flexible Confined Detonating Cord. The board provided 11 related recommendations. | |
| language | English | |
| title | NASA-LLIS-2257 | num |
| title | Lessons Learned – Orbiting Carbon Observatory (OCO) Launch Vehicle Mishap Investigation Results | en |
| type | standard | |
| page | 5 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2009 | |
| contenttype | fulltext | |
| subject keywords | Additional Categories. | |
| subject keywords | Additional Categories.Accident Investigation | |
| subject keywords | Additional Categories.Energetic Materials - Explosive/Propellant/Pyrotechnic | |
| subject keywords | Additional Categories.Flight Equipment | |
| subject keywords | Additional Categories.Flight Operations | |
| subject keywords | Additional Categories.Hardware | |
| subject keywords | Additional Categories.Launch Vehicle | |
| subject keywords | Additional Categories.Payloads | |
| subject keywords | Additional Categories.Spacecraft | |
| subject keywords | Engineering Design (Phase C/D). | |
| subject keywords | Engineering Design (Phase C/D).Launch Systems | |
| subject keywords | Engineering Design (Phase C/D).Power | |
| subject keywords | Engineering Design (Phase C/D).Spacecraft and Spacecraft Instruments | |
| subject keywords | Manufacturing and Assembly | |
| subject keywords | Program Management. | |
| subject keywords | Program Management.Acquisition / procurement strategy and planning | |
| subject keywords | Safety and Mission Assurance. | |
| subject keywords | Safety and Mission Assurance.Product Assurance | |
| subject keywords | Safety and Mission Assurance.Quality |

درباره ما