• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API BULL 97

Well Construction Interface Document Guidelines - FIRST EDITION

Organization:
API - American Petroleum Institute
Year: 2013

Abstract: This bulletin provides guidance on information that is to be shared regarding well construction and rigspecific operating guidelines. It is intended to align the lease operator's safety and environmental management system (SEMS) with drilling contractor's safe work practices (CSWP).
The well construction interface document (WCID) is used to formalize the exchange of information as shown in Figure 1.
NOTE The WCID is not intended to duplicate the health, safety, and environment (HSE) information addressed by the lease operator's HSE bridging document with the drilling contractor.
The WCID-SEMS is a bridging document that includes the elements identified in API 75 within the context of well construction activities. It is understood that work processes vary between operators and contractors, which should be honored in the development of the WCID document.
The intent of the bridging document between the lease operator's SEMS and the CSWP is to provide:
a) an outline of responsibilities for the lease operator's and drilling contractor's personnel;
b) acknowledgement that management of change (MOC) and risk assessment processes should be used:
- during well construction activities,
To address personnel or organizational changes to ensure personnel skill level is sufficient for the applicable position;
c) a vehicle for the drilling contractor to be involved when operational changes and/or conditions are identified that could require a well activity risk assessment;
d) a method to align all parties with regard to drilling HSE standards and applicable regulatory requirements; e) a method of communicating stop work authority.
The WCID-well plan contains the following elements (shown in Figure 1):
a) well design:
- location and environment,
- geological and geophysical;
b) well barrier plan risk identification;
c) well execution plan.
To enhance safe operations, the well plan provides a basis for discussion of well construction equipment, barriers, risks, and the mitigations for those risks.
EXAMPLE Drilling contractor rig-specific operating guideline examples:
a) well control practices:
- shut-in procedures,
- blowout preventer (BOP) configuration;
b) equipment constraints:
- rig capacity;
c) well-specific operating guidelines:
- watch circle.
URI: https://yse.yabesh.ir/std/handle/yse/67655
Collections :
  • API - American Petroleum Institute
  • Download PDF : (332.2Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API BULL 97

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T16:04:25Z
date available2017-09-04T16:04:25Z
date copyright2013.12.01
date issued2013
identifier otherRTACHFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/67655
description abstractThis bulletin provides guidance on information that is to be shared regarding well construction and rigspecific operating guidelines. It is intended to align the lease operator's safety and environmental management system (SEMS) with drilling contractor's safe work practices (CSWP).
The well construction interface document (WCID) is used to formalize the exchange of information as shown in Figure 1.
NOTE The WCID is not intended to duplicate the health, safety, and environment (HSE) information addressed by the lease operator's HSE bridging document with the drilling contractor.
The WCID-SEMS is a bridging document that includes the elements identified in API 75 within the context of well construction activities. It is understood that work processes vary between operators and contractors, which should be honored in the development of the WCID document.
The intent of the bridging document between the lease operator's SEMS and the CSWP is to provide:
a) an outline of responsibilities for the lease operator's and drilling contractor's personnel;
b) acknowledgement that management of change (MOC) and risk assessment processes should be used:
- during well construction activities,
To address personnel or organizational changes to ensure personnel skill level is sufficient for the applicable position;
c) a vehicle for the drilling contractor to be involved when operational changes and/or conditions are identified that could require a well activity risk assessment;
d) a method to align all parties with regard to drilling HSE standards and applicable regulatory requirements; e) a method of communicating stop work authority.
The WCID-well plan contains the following elements (shown in Figure 1):
a) well design:
- location and environment,
- geological and geophysical;
b) well barrier plan risk identification;
c) well execution plan.
To enhance safe operations, the well plan provides a basis for discussion of well construction equipment, barriers, risks, and the mitigations for those risks.
EXAMPLE Drilling contractor rig-specific operating guideline examples:
a) well control practices:
- shut-in procedures,
- blowout preventer (BOP) configuration;
b) equipment constraints:
- rig capacity;
c) well-specific operating guidelines:
- watch circle.
languageEnglish
titleAPI BULL 97num
titleWell Construction Interface Document Guidelines - FIRST EDITIONen
typestandard
page28
statusActive
treeAPI - American Petroleum Institute:;2013
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian