• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0111

Lessons Learned - LH2 Quick Disconnects (QD)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
Quick disconnects, utilized for providing gasses to the space shuttle main engine drying/purge lines and the main propulsion system LH2 prepressurization system are identical and can be crossconnected in the OPF. The MPS heated GN2 purge panel provides heated or unheated GN2 at 645 +/- 65 psig for engine drying. Should GN2 645 +/- 65 psig be introduced to the GH2 prepressurization system, flight hardware damage could occur. This condition may or may not be visible on the firing room pressure gages depending upon the status of orbiter power.
URI: https://yse.yabesh.ir/std/handle/yse/67949
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.87Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0111

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:04:44Z
date available2017-09-04T16:04:44Z
date copyright08/27/1992
date issued1992
identifier otherRTYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/67949
description abstractDescription of Driving Event:
Quick disconnects, utilized for providing gasses to the space shuttle main engine drying/purge lines and the main propulsion system LH2 prepressurization system are identical and can be crossconnected in the OPF. The MPS heated GN2 purge panel provides heated or unheated GN2 at 645 +/- 65 psig for engine drying. Should GN2 645 +/- 65 psig be introduced to the GH2 prepressurization system, flight hardware damage could occur. This condition may or may not be visible on the firing room pressure gages depending upon the status of orbiter power.
languageEnglish
titleNASA-LLIS-0111num
titleLessons Learned - LH2 Quick Disconnects (QD)en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHuman Factors
subject keywordsLaunch Process
subject keywordsLaunch Vehicle
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian