• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-4236

Lessons Learned - Facility Building B1201 Roof Repair Mishap

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: Abstract:
During weekend work conducted February 3 and 4, 2007, contract workers removed the existing B1201 roof material, which uncovered an old drain (drain 1). This drain 1 had been abandoned in place, the drain pipe had been cut, and vertical section removed below the roof deck. During the same activity the roofers broke the PVC bowl of a nearby active drain (drain 2). The workers, believing that drain 1 was viable, proceeded to unblock the drain pipe and finished the drain location to the completed roof. As part of the same operation, the workers did not repair the drain 2 damage, instead they covered over this drain. Over one (1) inch of rain fell at the Stennis Space Center during the night of February 12th and the morning of the 13th. Rain entered B1201 through drain 1; the rain fell on and damaged several pieces of IT equipment. In a separate location another drain pipe connection to an internal drain also failed, allowing water to flood an adjacent hallway. This incident was classified a Type B Mishap according to NPR 8621.1B -- 'NASA Procedural Requirements for Mishap Reporting, Investigation, and Recordkeeping'.
The proximate causes leading to the mishap are listed below.
1. The abandoned drain (drain 1) opened at roof level.
2. The opened, abandoned drain (drain 1) pipe ended above IT equipment.
URI: https://yse.yabesh.ir/std/handle/yse/70715
Subject: Acquisition / procurement strategy and planning
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (116.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-4236

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:07:33Z
date available2017-09-04T16:07:33Z
date copyright40473
date issued2010
identifier otherSBMGFDAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/70715
description abstractAbstract:
During weekend work conducted February 3 and 4, 2007, contract workers removed the existing B1201 roof material, which uncovered an old drain (drain 1). This drain 1 had been abandoned in place, the drain pipe had been cut, and vertical section removed below the roof deck. During the same activity the roofers broke the PVC bowl of a nearby active drain (drain 2). The workers, believing that drain 1 was viable, proceeded to unblock the drain pipe and finished the drain location to the completed roof. As part of the same operation, the workers did not repair the drain 2 damage, instead they covered over this drain. Over one (1) inch of rain fell at the Stennis Space Center during the night of February 12th and the morning of the 13th. Rain entered B1201 through drain 1; the rain fell on and damaged several pieces of IT equipment. In a separate location another drain pipe connection to an internal drain also failed, allowing water to flood an adjacent hallway. This incident was classified a Type B Mishap according to NPR 8621.1B -- 'NASA Procedural Requirements for Mishap Reporting, Investigation, and Recordkeeping'.
The proximate causes leading to the mishap are listed below.
1. The abandoned drain (drain 1) opened at roof level.
2. The opened, abandoned drain (drain 1) pipe ended above IT equipment.
languageEnglish
titleNASA-LLIS-4236num
titleLessons Learned - Facility Building B1201 Roof Repair Mishapen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsAcquisition / procurement strategy and planning
subject keywordsCommunications between different offices and contractor personnel
subject keywordsContractor relationships
subject keywordsFacilities
subject keywordsGround processing and manifesting
subject keywordsInternational partner coordination
subject keywordsMaintenance
subject keywordsReview systems and boards
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian