MSFC-SPEC-3111 CHG NOTICE 1
PAYLOAD PLANNING SYSTEM (PPS) SOFTWARE REQUIREMENTS SPECIFICATION
Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2001
Abstract: This document defines the software capabilities requirements for selected components of the International Space Station (ISS) Program Payload Planning System (PPS). These include Planner, User Requirements Collection (URC), External Data Repository (EDR), Data System Routing and Configuration (DSRC), Consolidated Planning System (CPS) to EDR Interface (CEIT), Resource Envelope Management (REM), and Product Generation (PG).
The seven appendices, A through G, contain the Capability Requirements that are found in section three of the respective Software Implementation Requirements Documents (SIRDs). These are Level IV documents and are under the control of the PPS Software Review Board (SRB). These appendices will be updated in parallel with the respective SIRD.
The seven appendices, A through G, contain the Capability Requirements that are found in section three of the respective Software Implementation Requirements Documents (SIRDs). These are Level IV documents and are under the control of the PPS Software Review Board (SRB). These appendices will be updated in parallel with the respective SIRD.
Collections
:
-
Statistics
MSFC-SPEC-3111 CHG NOTICE 1
Show full item record
| contributor author | MSFC - NASA - MSFC - Marshall Space Flight Center | |
| date accessioned | 2017-09-04T16:07:39Z | |
| date available | 2017-09-04T16:07:39Z | |
| date copyright | 07/13/2001 | |
| date issued | 2001 | |
| identifier other | SBXIJBAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/70863 | |
| description abstract | This document defines the software capabilities requirements for selected components of the International Space Station (ISS) Program Payload Planning System (PPS). These include Planner, User Requirements Collection (URC), External Data Repository (EDR), Data System Routing and Configuration (DSRC), Consolidated Planning System (CPS) to EDR Interface (CEIT), Resource Envelope Management (REM), and Product Generation (PG). The seven appendices, A through G, contain the Capability Requirements that are found in section three of the respective Software Implementation Requirements Documents (SIRDs). These are Level IV documents and are under the control of the PPS Software Review Board (SRB). These appendices will be updated in parallel with the respective SIRD. | |
| language | English | |
| title | MSFC-SPEC-3111 CHG NOTICE 1 | num |
| title | PAYLOAD PLANNING SYSTEM (PPS) SOFTWARE REQUIREMENTS SPECIFICATION | en |
| type | standard | |
| page | 182 | |
| status | Active | |
| tree | MSFC - NASA - MSFC - Marshall Space Flight Center:;2001 | |
| contenttype | fulltext |

درباره ما