• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASME - ASME International
  • View Item
  •   YSE
  • Industrial Standards
  • ASME - ASME International
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASME PTC 6S REPORT

Procedures for Routine Performance Tests of Steam Turbines

Organization:
ASME - ASME International
Year: 2014

Abstract: Sections 3 through 5 of this Report present general recommendations for instrumentation and test planning. These recommendations are based on current industry practice for the periodic determination of turbine-cycle performance. Section 6 discusses interpretation of test results and shows typical plots of test data for analysis of turbine performance. Sections 7 through 12 present test procedures for selected types of turbine cycles. Each of these procedures contains specific recommendations for instrumentation and method for testing's elected turbine type. Although all possible turbine types are not covered, some typical examples are presented. Combinations of the types presented may be used to cover other arrangements. For each recommended test procedure, the expected value of repeatability is estimated on the basis of current industry experience. This value of repeatability must be used to judge the significance of the indicated level of performance s compared to the chronological trend of past performance. (See para. 3.8.3 for discussion of repeatability.)
PURPOSE OF REPORT
This Report provides turbine-test procedures for the analysis and supervision of relative performance throughout the life of the turbine. These procedures will determine trends of operating efficiency, detect trouble, and furnish test data to evaluate efficiency changes in the turbine cycle. These procedures are designed to minimize test instrumentation and personnel. However, precision instrumentation at critical test locations is recommended for reliable results. A high degree of repeatability, rather than the acceptance test level of performance, is sought
URI: https://yse.yabesh.ir/std/handle/yse/73495
Collections :
  • ASME - ASME International
  • Download PDF : (6.645Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASME PTC 6S REPORT

Show full item record

contributor authorASME - ASME International
date accessioned2017-09-04T16:10:14Z
date available2017-09-04T16:10:14Z
date copyright1988.01.01 (R 1995)(R 2003)(R 2009)(R 2014)
date issued2014
identifier otherSIWSHFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/73495
description abstractSections 3 through 5 of this Report present general recommendations for instrumentation and test planning. These recommendations are based on current industry practice for the periodic determination of turbine-cycle performance. Section 6 discusses interpretation of test results and shows typical plots of test data for analysis of turbine performance. Sections 7 through 12 present test procedures for selected types of turbine cycles. Each of these procedures contains specific recommendations for instrumentation and method for testing's elected turbine type. Although all possible turbine types are not covered, some typical examples are presented. Combinations of the types presented may be used to cover other arrangements. For each recommended test procedure, the expected value of repeatability is estimated on the basis of current industry experience. This value of repeatability must be used to judge the significance of the indicated level of performance s compared to the chronological trend of past performance. (See para. 3.8.3 for discussion of repeatability.)
PURPOSE OF REPORT
This Report provides turbine-test procedures for the analysis and supervision of relative performance throughout the life of the turbine. These procedures will determine trends of operating efficiency, detect trouble, and furnish test data to evaluate efficiency changes in the turbine cycle. These procedures are designed to minimize test instrumentation and personnel. However, precision instrumentation at critical test locations is recommended for reliable results. A high degree of repeatability, rather than the acceptance test level of performance, is sought
languageEnglish
titleASME PTC 6S REPORTnum
titleProcedures for Routine Performance Tests of Steam Turbinesen
typestandard
page137
statusActive
treeASME - ASME International:;2014
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian