• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5957

Sensor Package 1 (SP1) Pan/Tilt Unit Damage

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: On July 31, 2007, a Sensor Pack 1 (SP1) was found damaged during placement into a shipping container following a successful Integrated Verification Test (IVT). IVT is an electrical functional verification of the SP1 while integrated to the Canadian Orbiter Boom Sensor System (OBSS). The test was performed on the Level 13 platforms in the Orbiter Processing Facility (OPF) OPF-3, in preparation for later installation into the OV-103 (Discovery) payload bay.
URI: https://yse.yabesh.ir/std/handle/yse/74365
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (96.23Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5957

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:11:07Z
date available2017-09-04T16:11:07Z
date copyright08/23/2012
date issued2012
identifier otherSLIKYEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/74365
description abstractOn July 31, 2007, a Sensor Pack 1 (SP1) was found damaged during placement into a shipping container following a successful Integrated Verification Test (IVT). IVT is an electrical functional verification of the SP1 while integrated to the Canadian Orbiter Boom Sensor System (OBSS). The test was performed on the Level 13 platforms in the Orbiter Processing Facility (OPF) OPF-3, in preparation for later installation into the OV-103 (Discovery) payload bay.
languageEnglish
titleNASA-LLIS-5957num
titleSensor Package 1 (SP1) Pan/Tilt Unit Damageen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian