• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • AIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
  • View Item
  •   YSE
  • Defence Standards
  • AIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

SMC-S-019 REV A

PROGRAM AND SUBCONTRACTOR MANAGEMENT

Organization:
AIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
Year: 2008

Abstract: Purpose
This standard establishes the requirements for preparation, implementation, and operation of a Program Management/Subcontract Management (PM/SM) program for application during the formulation, design, development, manufacture, assembly, integration, test, and sustainment of space and launch vehicle systems. These requirements are intended to:
1. Ensure a PM/SM program that defines all processes, roles, responsibilities, and resources required for the overall conduct and control of the program.
2. Develop and implement an Integrated Master Plan (IMP) linked with the Integrated Master Schedule (IMS) and integrated with the Earned Value Management System (EVMS).
3. Integrate all required technical, management, and administrative specialties fully into the product development and cross-product activities.
4. Define and implement a Subcontract Management Program that ensures that the activities and products of the subcontractors and suppliers are consistent with the overall program.
5. Implement a configuration management, change control, and approval process for any changes affecting the system requirements before the changes are implemented.
Application
This standard is intended for use in the acquisition of all SMC-developed weapons systems, including space and launch vehicle systems. This standard is intended to be cited in the contract, and may be tailored by the acquisition activity for a specific application or program.
Compliance with System Requirements
The requirements of this standard shall not relieve the contractor of the responsibility to comply with all equipment, system performance, and reliability requirements as set forth in the applicable specifications and contract.
URI: https://yse.yabesh.ir/std/handle/yse/75794
Collections :
  • AIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
  • Download PDF : (298.5Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    SMC-S-019 REV A

Show full item record

contributor authorAIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
date accessioned2017-09-04T16:12:32Z
date available2017-09-04T16:12:32Z
date copyright08/11/2008
date issued2008
identifier otherSPDQJEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/75794
description abstractPurpose
This standard establishes the requirements for preparation, implementation, and operation of a Program Management/Subcontract Management (PM/SM) program for application during the formulation, design, development, manufacture, assembly, integration, test, and sustainment of space and launch vehicle systems. These requirements are intended to:
1. Ensure a PM/SM program that defines all processes, roles, responsibilities, and resources required for the overall conduct and control of the program.
2. Develop and implement an Integrated Master Plan (IMP) linked with the Integrated Master Schedule (IMS) and integrated with the Earned Value Management System (EVMS).
3. Integrate all required technical, management, and administrative specialties fully into the product development and cross-product activities.
4. Define and implement a Subcontract Management Program that ensures that the activities and products of the subcontractors and suppliers are consistent with the overall program.
5. Implement a configuration management, change control, and approval process for any changes affecting the system requirements before the changes are implemented.
Application
This standard is intended for use in the acquisition of all SMC-developed weapons systems, including space and launch vehicle systems. This standard is intended to be cited in the contract, and may be tailored by the acquisition activity for a specific application or program.
Compliance with System Requirements
The requirements of this standard shall not relieve the contractor of the responsibility to comply with all equipment, system performance, and reliability requirements as set forth in the applicable specifications and contract.
languageEnglish
titleSMC-S-019 REV Anum
titlePROGRAM AND SUBCONTRACTOR MANAGEMENTen
typestandard
page21
statusActive
treeAIR FORCE - 02 - Air Force Network Integration Center (AFNIC):;2008
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian