• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3396

Lessons Learned - Dawn Ion Propulsion System (IPS)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: Abstract:
Although the Dawn IPS was planned for the most part as a built-to-print inheritance of the DS1 design, the Dawn project encountered significant cost and schedule escalation and technical difficulties. The IPS contractor suffered from management instability and from capabilities lost over the 6-year lag between the two projects. For relatively novel technologies, it may be necessary to re-qualify the capabilities of the contractor as well as re-qualifying the design for the new mission application.
URI: https://yse.yabesh.ir/std/handle/yse/80725
Subject: Engineering Design (Phase C/D).Propulsion
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (425.7Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3396

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:17:23Z
date available2017-09-04T16:17:23Z
date copyright04/06/2010
date issued2010
identifier otherTCMGFDAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/80725
description abstractAbstract:
Although the Dawn IPS was planned for the most part as a built-to-print inheritance of the DS1 design, the Dawn project encountered significant cost and schedule escalation and technical difficulties. The IPS contractor suffered from management instability and from capabilities lost over the 6-year lag between the two projects. For relatively novel technologies, it may be necessary to re-qualify the capabilities of the contractor as well as re-qualifying the design for the new mission application.
languageEnglish
titleNASA-LLIS-3396num
titleLessons Learned - Dawn Ion Propulsion System (IPS)en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsEngineering Design (Phase C/D).Propulsion
subject keywordsEngineering Design (Phase C/D).Spacecraft and Spacecraft Instruments
subject keywordsManufacturing and Assembly
subject keywordsProgram Management.Acquisition / procurement strategy and planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian