• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1495

Lessons Learned - Next Generation Launch Technology (NGLT): Establish an Early Link Between Systems Engineering & Analysis and Technology Projects

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2003

Abstract: Abstract:
Initially, there was no strong link between the VSR&T Project and the SE&A projects. This link was needed to ensure that the proper architectures and, hence, technologies were being addressed. Without the proper linkage to SE&A, the VSR&T Project may not have been addressing the critical technology requirements for the NGLT architectures under consideration. Systems engineering and analysis should be linked to the technology development projects early in the program.
URI: https://yse.yabesh.ir/std/handle/yse/8215
Subject: Communication Systems
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (14.68Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1495

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:10:01Z
date available2017-09-04T15:10:01Z
date copyright07/01/2003
date issued2003
identifier otherLPWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/8215
description abstractAbstract:
Initially, there was no strong link between the VSR&T Project and the SE&A projects. This link was needed to ensure that the proper architectures and, hence, technologies were being addressed. Without the proper linkage to SE&A, the VSR&T Project may not have been addressing the critical technology requirements for the NGLT architectures under consideration. Systems engineering and analysis should be linked to the technology development projects early in the program.
languageEnglish
titleNASA-LLIS-1495num
titleLessons Learned - Next Generation Launch Technology (NGLT): Establish an Early Link Between Systems Engineering & Analysis and Technology Projectsen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2003
contenttypefulltext
subject keywordsCommunication Systems
subject keywordsExternal Relations
subject keywordsFinancial Management
subject keywordsIndependent Verification and Validation
subject keywordsNASA Standards
subject keywordsPolicy & Planning
subject keywordsProgram and Project Management
subject keywordsResearch & Development
subject keywordsRisk Management/Assessment
subject keywordsSpacecraft
subject keywordsStandard
subject keywordsTest & Verification
subject keywordsTransportation
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian