• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0062

Lessons Learned - LRU Platform Hoist and Tube Assembly; Platform Hoist Tube Assembly "UP" Limit Switch Bypass

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
Three sections of a telescoping tube assembly at Pad B rotating service structure (RSS) fell while being extended to incorporate a planned modification (MOD). The MOD intended to eliminate binding that had been experienced during testing and verification. The falling tubes impacted and severely damaged the RSS and orbital maneuvering system pod covers. The contributing factor to this failure is that the fillet welds on tube "D" provided an outward ramp effect that caused excessive wear on the keepers and the eventual bowing of tube "C" which allowed less surface contact area between the welded stops and the keepers.
URI: https://yse.yabesh.ir/std/handle/yse/82419
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.18Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0062

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:18:58Z
date available2017-09-04T16:18:58Z
date copyright03/05/1992
date issued1992
identifier otherTGYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/82419
description abstractDescription of Driving Event:
Three sections of a telescoping tube assembly at Pad B rotating service structure (RSS) fell while being extended to incorporate a planned modification (MOD). The MOD intended to eliminate binding that had been experienced during testing and verification. The falling tubes impacted and severely damaged the RSS and orbital maneuvering system pod covers. The contributing factor to this failure is that the fillet welds on tube "D" provided an outward ramp effect that caused excessive wear on the keepers and the eventual bowing of tube "C" which allowed less surface contact area between the welded stops and the keepers.
languageEnglish
titleNASA-LLIS-0062num
titleLessons Learned - LRU Platform Hoist and Tube Assembly; Platform Hoist Tube Assembly "UP" Limit Switch Bypassen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsLifting Devices
subject keywordsPackaging Handling Storage
subject keywordsParts Materials & Processes
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian