• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1554

Lessons Learned – AATT Project

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year:

Abstract: Abstract:
A number of times, the AATT Project was directed to add, delete, and/or change the project»s focus of research, not only on existing agreed-to ATM products (tools and concepts), but in some cases, change of direction to develop totally new tools. It is understood that flexibility in research must be maintained in order that concepts that do not prove worthwhile can be dropped allowing for focus and priority shifts to more promising ones. However, both realistic and reasonable controls on project scope and priority setting must be maintained to assure prudent management planning and decision-making. Excessive control and redirection of focus/priorities late into a project»s life leads to wasteful use of resources and hampers the project»s ability to manage and deliver effectively. Significant changes well into the implementation phase can be very costly as contractual planning and funds obligations limit the scope and/or task requirement changes that can be made after the fact.
Directly related to the above is what we refer to as "milestone creep". Project management shifts, along with changing (sometimes mandated) project priorities, resulted in too many milestones that grew in number all the way into the last trimester of the project. This also made it difficult to adhere to a uniform, consistent milestone organization and management system, resulting in some subprojects with many more milestones and resultant work than others and the milestones becoming somewhat jumbled and not following the most logical sequencing. This caused a significant amount of work to support programmatic/administrative management, documentation and configuration control, tracking, etc. across organizations (including 3 centers and multiple directorates and divisions).
URI: https://yse.yabesh.ir/std/handle/yse/84284
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.91Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1554

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:20:52Z
date available2017-09-04T16:20:52Z
date copyrightN/A
identifier otherTLXCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/84284
description abstractAbstract:
A number of times, the AATT Project was directed to add, delete, and/or change the project»s focus of research, not only on existing agreed-to ATM products (tools and concepts), but in some cases, change of direction to develop totally new tools. It is understood that flexibility in research must be maintained in order that concepts that do not prove worthwhile can be dropped allowing for focus and priority shifts to more promising ones. However, both realistic and reasonable controls on project scope and priority setting must be maintained to assure prudent management planning and decision-making. Excessive control and redirection of focus/priorities late into a project»s life leads to wasteful use of resources and hampers the project»s ability to manage and deliver effectively. Significant changes well into the implementation phase can be very costly as contractual planning and funds obligations limit the scope and/or task requirement changes that can be made after the fact.
Directly related to the above is what we refer to as "milestone creep". Project management shifts, along with changing (sometimes mandated) project priorities, resulted in too many milestones that grew in number all the way into the last trimester of the project. This also made it difficult to adhere to a uniform, consistent milestone organization and management system, resulting in some subprojects with many more milestones and resultant work than others and the milestones becoming somewhat jumbled and not following the most logical sequencing. This caused a significant amount of work to support programmatic/administrative management, documentation and configuration control, tracking, etc. across organizations (including 3 centers and multiple directorates and divisions).
languageEnglish
titleNASA-LLIS-1554num
titleLessons Learned – AATT Projecten
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian