• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6498

Lessons Learned - When is the Appropriate Time to Implement Earned Value Management?

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: Although the EVM pilot exercise was implemented upon the transition to Phase A of the ICESat-2 project, some performance control and tracking system products were generated before the requisite EVM training and infrastructure was in place. Establish the project EVM infrastructure at project initiation, and assure project readiness to implement EVM prior to opening the first charge number.
URI: https://yse.yabesh.ir/std/handle/yse/88948
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (94.13Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6498

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:25:40Z
date available2017-09-04T16:25:40Z
date copyright05/23/2012
date issued2012
identifier otherTYJNXEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/88948
description abstractAlthough the EVM pilot exercise was implemented upon the transition to Phase A of the ICESat-2 project, some performance control and tracking system products were generated before the requisite EVM training and infrastructure was in place. Establish the project EVM infrastructure at project initiation, and assure project readiness to implement EVM prior to opening the first charge number.
languageEnglish
titleNASA-LLIS-6498num
titleLessons Learned - When is the Appropriate Time to Implement Earned Value Management?en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian