• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1314

Lessons Learned – Minimizing the Governments Risk by Sharing Program Cost and Responsibilities With the Contracto

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2002

Abstract: Description of Driving Event:
The Program cost and responsibilities were split 50/50 between the Government and the Contractor. This arrangement reflected the interest that each party had; the Government was interested in integrating several new technologies into a flight demonstration vehicle while the Contractor was interested in showcasing its rapid prototyping capabilities. These complimentary interests ensured each party maintained their commitments and mutual support.
URI: https://yse.yabesh.ir/std/handle/yse/89833
Subject: Risk Management/Assessment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.98Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1314

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:26:37Z
date available2017-09-04T16:26:37Z
date copyright01/01/2002
date issued2002
identifier otherUAWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/89833
description abstractDescription of Driving Event:
The Program cost and responsibilities were split 50/50 between the Government and the Contractor. This arrangement reflected the interest that each party had; the Government was interested in integrating several new technologies into a flight demonstration vehicle while the Contractor was interested in showcasing its rapid prototyping capabilities. These complimentary interests ensured each party maintained their commitments and mutual support.
languageEnglish
titleNASA-LLIS-1314num
titleLessons Learned – Minimizing the Governments Risk by Sharing Program Cost and Responsibilities With the Contractoen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2002
contenttypefulltext
subject keywordsRisk Management/Assessment
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian