description abstractAbstract:
Instead of using commercial off-the-shelf (COTS) equipment to replace the ground instrumentation data acquisition system (Permanent Measurement System [PMS]), NASA and its contractor designed the Ground Measurement System (GMS) in-house. As the result of a technology transfer effort, GMS was manufactured by a commercial vendor. The design of GMS was still undergoing changes during its implementation at the pad. Several components of the system never became fully operational. These complications eventually led the Ground Instrumentation department to replace GMS with a COTS implementation (GMS2/CDAS).
languageEnglish
titleNASA-LLIS-2956num
titleLessons Learned - Local Design vs. COTS Implementationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsAcquisition / procurement strategy and planning
subject keywordsBusiness processes
subject keywordsCrew operations and support concepts
subject keywordsEngineering design and project processes and standards
subject keywordsEntry Systems
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsGround support systems
subject keywordsLong term sustainability and maintenance planning
subject keywordsTest & Verification