• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-2956

Lessons Learned - Local Design vs. COTS Implementation

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: Abstract:
Instead of using commercial off-the-shelf (COTS) equipment to replace the ground instrumentation data acquisition system (Permanent Measurement System [PMS]), NASA and its contractor designed the Ground Measurement System (GMS) in-house. As the result of a technology transfer effort, GMS was manufactured by a commercial vendor. The design of GMS was still undergoing changes during its implementation at the pad. Several components of the system never became fully operational. These complications eventually led the Ground Instrumentation department to replace GMS with a COTS implementation (GMS2/CDAS).
URI: https://yse.yabesh.ir/std/handle/yse/90770
Subject: Acquisition / procurement strategy and planning
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (116.1Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-2956

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:27:40Z
date available2017-09-04T16:27:40Z
date copyright04/25/2010
date issued2010
identifier otherUDMGFDAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/90770
description abstractAbstract:
Instead of using commercial off-the-shelf (COTS) equipment to replace the ground instrumentation data acquisition system (Permanent Measurement System [PMS]), NASA and its contractor designed the Ground Measurement System (GMS) in-house. As the result of a technology transfer effort, GMS was manufactured by a commercial vendor. The design of GMS was still undergoing changes during its implementation at the pad. Several components of the system never became fully operational. These complications eventually led the Ground Instrumentation department to replace GMS with a COTS implementation (GMS2/CDAS).
languageEnglish
titleNASA-LLIS-2956num
titleLessons Learned - Local Design vs. COTS Implementationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsAcquisition / procurement strategy and planning
subject keywordsBusiness processes
subject keywordsCrew operations and support concepts
subject keywordsEngineering design and project processes and standards
subject keywordsEntry Systems
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsGround support systems
subject keywordsLong term sustainability and maintenance planning
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian