• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1526

Lessons Learned - Next Generation Launch Technology (NGLT)/Credible, Independent Cost Estimates are Needed Early in a Project

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2004

Abstract: Abstract:
The X-43C Project developed an internal cost effort using X-43A actual cost data and heritage United States Air Force (USAF) engine cost data. Two independent cost estimates were performed that were within 10% of the project estimate. Contract proposal estimates came in more than 50% over these estimates. This created significant problems for NASA and the USAF, ultimately contributing to its cancellation. The Agency should possess the ability to perform credible, independent cost estimates.
URI: https://yse.yabesh.ir/std/handle/yse/93290
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (14.66Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1526

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:30:01Z
date available2017-09-04T16:30:01Z
date copyright07/01/2004
date issued2004
identifier otherBOWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/93290
description abstractAbstract:
The X-43C Project developed an internal cost effort using X-43A actual cost data and heritage United States Air Force (USAF) engine cost data. Two independent cost estimates were performed that were within 10% of the project estimate. Contract proposal estimates came in more than 50% over these estimates. This created significant problems for NASA and the USAF, ultimately contributing to its cancellation. The Agency should possess the ability to perform credible, independent cost estimates.
languageEnglish
titleNASA-LLIS-1526num
titleLessons Learned - Next Generation Launch Technology (NGLT)/Credible, Independent Cost Estimates are Needed Early in a Projecten
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2004
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsNASA Standards
subject keywordsPolicy & Planning
subject keywordsProgram and Project Management
subject keywordsResearch & Development
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian