description abstractAbstract:
The Genesis sample return mishap was attributed to a design error in which the gravity switches that activate the parachute deployment sequence were phased (oriented) incorrectly so that their mechanisms could not detect the atmospheric entry. Mission critical functions should have functional backups as well as redundant hardware. Ensure that heritage designs that have been modified are fully tested, that design engineers fully understand the system function of their hardware, and that peer reviews of critical functions achieve full fidelity.
languageEnglish
titleNASA-LLIS-1733num
titleLessons Learned – Genesis Sample Return Mishap (2004)en
typestandard
page6
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2004
contenttypefulltext
subject keywordsAdditional Categories.
subject keywordsAdditional Categories.Accident Investigation
subject keywordsAdditional Categories.Aerospace Safety Advisory Panel
subject keywordsAdditional Categories.Flight Equipment
subject keywordsAdditional Categories.Flight Operations
subject keywordsAdditional Categories.Ground Operations
subject keywordsAdditional Categories.Hardware
subject keywordsAdditional Categories.Mishap Reporting
subject keywordsAdditional Categories.Payloads
subject keywordsAdditional Categories.Spacecraft
subject keywordsEngineering Design (Phase C/D).
subject keywordsEngineering Design (Phase C/D).Spacecraft and Spacecraft Instruments
subject keywordsMission Operations and Ground Support Systems.
subject keywordsMission Operations and Ground Support Systems.Mission control Planning
subject keywordsProgram Management.
subject keywordsProgram Management.Contractor relationships
subject keywordsSafety and Mission Assurance.
subject keywordsSafety and Mission Assurance.Product Assurance
subject keywordsSafety and Mission Assurance.Review systems and boards
subject keywordsSystems Engineering and Analysis.
subject keywordsSystems Engineering and Analysis.Engineering design and project processes and standards
subject keywordsSystems Engineering and Analysis.Planning of requirements verification processes