NASA-LLIS-0896
Lessons Learned – Minimizing Impacts Associated with Construction Operations at Mission Critical Facilities
Year: 2000
Abstract: Description of Driving Event:
Construction operations aimed at improving accommodations or improving the capabilities of a mission critical support facility are required periodically. An extensive construction effort was underway at the Spacecraft Operations Control Center (SOCC) in Suitland, Maryland during the period immediately preceding the launch of the GOES-L spacecraft (5/3/00). Standard operating procedure for the SOCC is to freeze the hardware/software configuration of the facility 30 days prior to launch. On-going construction at the facility made it difficult to satisfy this requirement without impacting the facility construction schedule, which can effect multiple programs.
Construction operations aimed at improving accommodations or improving the capabilities of a mission critical support facility are required periodically. An extensive construction effort was underway at the Spacecraft Operations Control Center (SOCC) in Suitland, Maryland during the period immediately preceding the launch of the GOES-L spacecraft (5/3/00). Standard operating procedure for the SOCC is to freeze the hardware/software configuration of the facility 30 days prior to launch. On-going construction at the facility made it difficult to satisfy this requirement without impacting the facility construction schedule, which can effect multiple programs.
Subject: Configuration Management
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:34:01Z | |
| date available | 2017-09-04T16:34:01Z | |
| date copyright | 07/18/2000 | |
| date issued | 2000 | |
| identifier other | UVTEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/97374 | |
| description abstract | Description of Driving Event: Construction operations aimed at improving accommodations or improving the capabilities of a mission critical support facility are required periodically. An extensive construction effort was underway at the Spacecraft Operations Control Center (SOCC) in Suitland, Maryland during the period immediately preceding the launch of the GOES-L spacecraft (5/3/00). Standard operating procedure for the SOCC is to freeze the hardware/software configuration of the facility 30 days prior to launch. On-going construction at the facility made it difficult to satisfy this requirement without impacting the facility construction schedule, which can effect multiple programs. | |
| language | English | |
| title | NASA-LLIS-0896 | num |
| title | Lessons Learned – Minimizing Impacts Associated with Construction Operations at Mission Critical Facilities | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2000 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Facilities | |
| subject keywords | Flight Operations | |
| subject keywords | Ground Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | Safety & Mission Assurance | |
| subject keywords | Test Facility |

درباره ما