• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API RP 2A-WSD

Planning, Designing, and Constructing Fixed Offshore Platforms-Working Stress Design - TWENTY-SECOND EDITION

Organization:
API - American Petroleum Institute
Year: 2014

Abstract: This recommended practice is based on global industry best practices and serves as a guide for those who are concerned with the design and construction of new fixed offshore platforms and for the relocation of existing platforms used for the drilling, development, production, and storage of hydrocarbons in offshore areas.
NOTE 1 Specific guidance for hurricane conditions in the Gulf of Mexico and other U.S. offshore areas, previously provided in API 2A-WSD, 21st Edition, Section 2, is now provided in API 2MET.
NOTE 2 Specific guidance for earthquake loading in U.S. offshore areas, previously provided in the API 2A-WSD, 21st Edition, Section 2, is now provided in API 2EQ.
NOTE 3 Specific guidance for soil and foundation considerations in offshore areas, previously provided in API 2A-WSD, 21st Edition, Section 6, is now provided in API 2GEO.
NOTE 4 Specific guidance for the evaluation of structural damage, above and below water structural inspection, fitness-for-purpose assessment, risk reduction and mitigation planning, plus the process of decommissioning has been removed and is now provided in API 2SIM.
NOTE 5 Specific guidance for fire and blast loading, previously provided in the 2A-WSD, 21st Edition, Section 18, is now provided in API 2FB [3].
NOTE 6 Specific guidance for marine operations, supplementing the guidance provided in this document, is now provided in API 2MOP [6]. The provisions in API 2A-WSD shall govern if there are any conflicts.
URI: https://yse.yabesh.ir/std/handle/yse/98979
Collections :
  • API - American Petroleum Institute
  • Download PDF : (4.971Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API RP 2A-WSD

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T16:35:27Z
date available2017-09-04T16:35:27Z
date copyright2014.11.01
date issued2014
identifier otherVAEHJFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/98979
description abstractThis recommended practice is based on global industry best practices and serves as a guide for those who are concerned with the design and construction of new fixed offshore platforms and for the relocation of existing platforms used for the drilling, development, production, and storage of hydrocarbons in offshore areas.
NOTE 1 Specific guidance for hurricane conditions in the Gulf of Mexico and other U.S. offshore areas, previously provided in API 2A-WSD, 21st Edition, Section 2, is now provided in API 2MET.
NOTE 2 Specific guidance for earthquake loading in U.S. offshore areas, previously provided in the API 2A-WSD, 21st Edition, Section 2, is now provided in API 2EQ.
NOTE 3 Specific guidance for soil and foundation considerations in offshore areas, previously provided in API 2A-WSD, 21st Edition, Section 6, is now provided in API 2GEO.
NOTE 4 Specific guidance for the evaluation of structural damage, above and below water structural inspection, fitness-for-purpose assessment, risk reduction and mitigation planning, plus the process of decommissioning has been removed and is now provided in API 2SIM.
NOTE 5 Specific guidance for fire and blast loading, previously provided in the 2A-WSD, 21st Edition, Section 18, is now provided in API 2FB [3].
NOTE 6 Specific guidance for marine operations, supplementing the guidance provided in this document, is now provided in API 2MOP [6]. The provisions in API 2A-WSD shall govern if there are any conflicts.
languageEnglish
titleAPI RP 2A-WSDnum
titlePlanning, Designing, and Constructing Fixed Offshore Platforms-Working Stress Design - TWENTY-SECOND EDITIONen
typestandard
page324
statusActive
treeAPI - American Petroleum Institute:;2014
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian