• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-4581

Lessons Learned - Programs Need A Robust Change Request (CR) Pipeline Tool

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: The Constellation Program (CxP) developed a tool to alert Projects within the Program of upcoming Change Requests (CRs). This tool was known as the CR pipeline tool. Management of Constellation Program CR Pipeline tool utilization needs to be improved in order to ensure traceability for all CRs entered into the tool, to ensure proper flow-down actions related to assessing the CR, tracking CR withdrawals , and to provide accurate change management reports and metrics. Withdrawn CRs should never just be deleted; a record of withdrawal should be retained.
URI: https://yse.yabesh.ir/std/handle/yse/9917
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (58.76Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-4581

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:11:29Z
date available2017-09-04T15:11:29Z
date copyright41215
date issued2012
identifier otherLUKZAFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/9917
description abstractThe Constellation Program (CxP) developed a tool to alert Projects within the Program of upcoming Change Requests (CRs). This tool was known as the CR pipeline tool. Management of Constellation Program CR Pipeline tool utilization needs to be improved in order to ensure traceability for all CRs entered into the tool, to ensure proper flow-down actions related to assessing the CR, tracking CR withdrawals , and to provide accurate change management reports and metrics. Withdrawn CRs should never just be deleted; a record of withdrawal should be retained.
languageEnglish
titleNASA-LLIS-4581num
titleLessons Learned - Programs Need A Robust Change Request (CR) Pipeline Toolen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian