• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0157

Lessons Learned - External Tank (ET) Vent Deceleration Unit.

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
The external tank's gaseous hydrogen vent arm provides for venting of the LH2 tank, pneumatics, and electrical services to the ground umilical carrier. The deceleration unit has failed twice. These failures were caused by a low fluid level in the shock absorber. During one launch failure the QD was damaged and broke in half. Several hours after launch, the detanking of the LH2 dewer tank was started and gaseous hydrogen vented out of the broken QD/pipe, instead of venting to the Pad-A burn pond as designated.
URI: http://yse.yabesh.ir/std/handle/yse/109588
Subject: Energetic Materials - Explosive/Propellant/Pyrotechnic
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.91Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0157

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:46:16Z
date available2017-09-04T16:46:16Z
date copyright33885
date issued1992
identifier otherWBZCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/109588
description abstractDescription of Driving Event:
The external tank's gaseous hydrogen vent arm provides for venting of the LH2 tank, pneumatics, and electrical services to the ground umilical carrier. The deceleration unit has failed twice. These failures were caused by a low fluid level in the shock absorber. During one launch failure the QD was damaged and broke in half. Several hours after launch, the detanking of the LH2 dewer tank was started and gaseous hydrogen vented out of the broken QD/pipe, instead of venting to the Pad-A burn pond as designated.
languageEnglish
titleNASA-LLIS-0157num
titleLessons Learned - External Tank (ET) Vent Deceleration Unit.en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsEnergetic Materials - Explosive/Propellant/Pyrotechnic
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsGround Operations
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian