• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0623

Lessons Learned – Tethered Satellite System De-integration Process Lesson Learned

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1999

Abstract: Description of Driving Event:
The Tethered Satellite System (TSS) Satellite Support Assembly (SAA) was inadvertently scheduled for delivery to the Florida Space Institute prior to de-integration of live ordnance. The scheduled delivery resulted from a request for donation of the SAA following utilization of TSS on STS-75. During offload operations of the SAA at Cape Canaveral Air Force Station (CCAS), a technician recognized six NASA Standard Initiators (NSI's) still installed on the hardware. The NSI's were all examined and determined to be "live" category B ordnance with Faraday caps installed. Explosive Ordnance Disposal (EOD) personnel then removed the six devices for proper disposition. The remainder of the satellite equipment was subsequently closely examined to verify there were no other hazards. No personnel were exposed to the live NSI's. The event was classified as a "Close Call" and entered into the Incident Reporting Information System (IRIS) database for review and implementation of corrective action(s). The cause of this incident was determined to be inadequate configuration control of flight hardware during the de-integration process. This resulted in a loss of accountability for hazardous items integral to the design. This is a situation particular to flight hardware not scheduled for re-flight. Hardware scheduled for re-flight (unlike TSS) possess adequate configuration control of hazardous items.
URI: http://yse.yabesh.ir/std/handle/yse/139971
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.44Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0623

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:16:30Z
date available2017-09-04T17:16:30Z
date copyright06/02/1999
date issued1999
identifier otherZGCEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/139971
description abstractDescription of Driving Event:
The Tethered Satellite System (TSS) Satellite Support Assembly (SAA) was inadvertently scheduled for delivery to the Florida Space Institute prior to de-integration of live ordnance. The scheduled delivery resulted from a request for donation of the SAA following utilization of TSS on STS-75. During offload operations of the SAA at Cape Canaveral Air Force Station (CCAS), a technician recognized six NASA Standard Initiators (NSI's) still installed on the hardware. The NSI's were all examined and determined to be "live" category B ordnance with Faraday caps installed. Explosive Ordnance Disposal (EOD) personnel then removed the six devices for proper disposition. The remainder of the satellite equipment was subsequently closely examined to verify there were no other hazards. No personnel were exposed to the live NSI's. The event was classified as a "Close Call" and entered into the Incident Reporting Information System (IRIS) database for review and implementation of corrective action(s). The cause of this incident was determined to be inadequate configuration control of flight hardware during the de-integration process. This resulted in a loss of accountability for hazardous items integral to the design. This is a situation particular to flight hardware not scheduled for re-flight. Hardware scheduled for re-flight (unlike TSS) possess adequate configuration control of hazardous items.
languageEnglish
titleNASA-LLIS-0623num
titleLessons Learned – Tethered Satellite System De-integration Process Lesson Learneden
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1999
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsEnergetic Materials - Explosive/Propellant/Pyrotechnic
subject keywordsExplosives Handling
subject keywordsFlight Equipment
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian