• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0929

Lessons Learned – Planning Effective Project Reviews (1999)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2000

Abstract: Abstract:
The root cause of the Mars Climate Orbiter (MCO) mission failure was identified as cumulative navigation errors. These errors resulted, in part, from operational procedures and software that were inadequately reviewed, evaluated, and implemented. A high degree of formality, anomaly follow-up and close out, selection of reviewers and penetration of technical issues is essential in the review process, including the design, operational, and peer reviews.
URI: http://yse.yabesh.ir/std/handle/yse/141365
Subject: Aircraft
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (16.03Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0929

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:18:02Z
date available2017-09-04T17:18:02Z
date copyright36859
date issued2000
identifier otherZJUEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/141365
description abstractAbstract:
The root cause of the Mars Climate Orbiter (MCO) mission failure was identified as cumulative navigation errors. These errors resulted, in part, from operational procedures and software that were inadequately reviewed, evaluated, and implemented. A high degree of formality, anomaly follow-up and close out, selection of reviewers and penetration of technical issues is essential in the review process, including the design, operational, and peer reviews.
languageEnglish
titleNASA-LLIS-0929num
titleLessons Learned – Planning Effective Project Reviews (1999)en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsAircraft
subject keywordsFlight Equipment
subject keywordsFlight Operations
subject keywordsFormal Review
subject keywordsGround Equipment
subject keywordsLaunch Process
subject keywordsPayloads
subject keywordsPolicy & Planning
subject keywordsRisk Management/Assessment
subject keywordsSafety & Mission Assurance
subject keywordsSpacecraft
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian