NASA-LLIS-0010
Lessons Learned - Repair of a Failed Component (Shuttle Orbiter General Purpose Computer Hardware Interface Soldered Pin) Before Investigation of the Cause of the Failure
Year: 1991
Abstract: Description of Driving Event:
A shuttle orbiter General Purpose Computer (GPC) at Input Output Port (IOP) No.2 was voted out of a set with other computers. The computers were exchanged and the computer connected at IOP No.2 also malfunctioned, indicating the problem was with the IOP. A pin solder joint was found to be fractured. The unit was repaired without investigating the cause of the joint failure. Rework procedures were revised to require an investigation of the cause of a failure before any attempt to repair the failed component.
A shuttle orbiter General Purpose Computer (GPC) at Input Output Port (IOP) No.2 was voted out of a set with other computers. The computers were exchanged and the computer connected at IOP No.2 also malfunctioned, indicating the problem was with the IOP. A pin solder joint was found to be fractured. The unit was repaired without investigating the cause of the joint failure. Rework procedures were revised to require an investigation of the cause of a failure before any attempt to repair the failed component.
Subject: Computers
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:18:04Z | |
| date available | 2017-09-04T17:18:04Z | |
| date copyright | 06/17/1991 | |
| date issued | 1991 | |
| identifier other | CBYCQCAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std/handle/yse/141412 | |
| description abstract | Description of Driving Event: A shuttle orbiter General Purpose Computer (GPC) at Input Output Port (IOP) No.2 was voted out of a set with other computers. The computers were exchanged and the computer connected at IOP No.2 also malfunctioned, indicating the problem was with the IOP. A pin solder joint was found to be fractured. The unit was repaired without investigating the cause of the joint failure. Rework procedures were revised to require an investigation of the cause of a failure before any attempt to repair the failed component. | |
| language | English | |
| title | NASA-LLIS-0010 | num |
| title | Lessons Learned - Repair of a Failed Component (Shuttle Orbiter General Purpose Computer Hardware Interface Soldered Pin) Before Investigation of the Cause of the Failure | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1991 | |
| contenttype | fulltext | |
| subject keywords | Computers | |
| subject keywords | Ground Operations | |
| subject keywords | Hardware |