• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6476

Lessons Learned - Earned Value Management: Define and Maintain Work Authorization Documentation at all Levels

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: During a pilot exercise intended to advance the practice of EVM at NASA, it was discovered that the subject of the pilot (the ICESat-2 project) lacked the necessary formal assignment of authority and responsibility at the work performance level. The flow-down of authority and responsibility to the project should be adequately documented, project plans should be maintained, work should be traceable to account numbers, and the documentation should reflect funding changes.
URI: http://yse.yabesh.ir/std/handle/yse/144756
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (117.7Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6476

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:21:33Z
date available2017-09-04T17:21:33Z
date copyright03/22/2012
date issued2012
identifier otherCCWBXEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/144756
description abstractDuring a pilot exercise intended to advance the practice of EVM at NASA, it was discovered that the subject of the pilot (the ICESat-2 project) lacked the necessary formal assignment of authority and responsibility at the work performance level. The flow-down of authority and responsibility to the project should be adequately documented, project plans should be maintained, work should be traceable to account numbers, and the documentation should reflect funding changes.
languageEnglish
titleNASA-LLIS-6476num
titleLessons Learned - Earned Value Management: Define and Maintain Work Authorization Documentation at all Levelsen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian