• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • NFPA - (NFPA) - National Fluid Power Association
  • View Item
  •   YSE
  • Industrial Standards
  • NFPA - (NFPA) - National Fluid Power Association
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NFPA 3H

Commissioning and Integrated System Testing Handbook

Organization:
NFPA - (NFPA) - National Fluid Power Association
Year: 2012

Abstract: This recommended practice provides the recommended procedures, methods, and documentation for commissioning and integrated testing of active and passive fire protection and life safety systems and their interconnections with other building systems.
Special emphasis should be placed on the phrase "recommended procedures, methods, and documentation." The recommendations in this document provide a framework for commissioning and integrated testing. Although the actual commissioning of systems might not be the same for two different buildings, it should follow the same process. Similarly, the actual integrated testing of two systems in one building might not be the same as integrated testing in a second building for a variety of reasons. However, the process that is followed, as noted in NFPA 3, should remain the same.
Purpose
The purpose of this recommended practice is to describe the commissioning process and integrated testing that will ensure fire protection and life safety systems perform in conformity with the design intent.
A.1.2 System commissioning and integrated testing is critical to ascertain that systems are installed and function in accordance with the BOD and OPR and that testing is documented. It is not the intent of this recommended practice to supplant the existing requirements of other codes and standards, but this recommended practice can provide the appropriate guidance for a specific system or component where testing is not otherwise addressed. Such guidance should be developed by the fire protection and life safety commissioning team.
NFPA 3 has been developed as a fi rst step to address the concern of both the commissioning industry and regulatory agencies that a gap exists between the individual installation standards. An individual installation standard provides design, installation, and test requirements for a specifi c system. NFPA 3 bridges the gap between the individual standards to help ensure that fi re protection and life safety systems are designed, installed, tested, and verifi ed as a whole.
Commissioning is a process and not an event. This process begins at the planning phase of a project and continues through design, construction, and occupancy. NFPA 3 provides the framework for the Cx process relative to fire protection and life safety systems. The requirements for testing or verification of an individual system are found in the appropriate installation standard. The framework for testing and verification of integrated systems is found in NFPA 3. The specific procedures to be followed should be developed by the commissioning team, using the framework provided in NFPA 3.
URI: http://yse.yabesh.ir/std/handle/yse/149655
Collections :
  • NFPA - (NFPA) - National Fluid Power Association
  • Download PDF : (13.00Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NFPA 3H

Show full item record

contributor authorNFPA - (NFPA) - National Fluid Power Association
date accessioned2017-09-04T17:26:32Z
date available2017-09-04T17:26:32Z
date copyright2012.01.01
date issued2012
identifier otherCKOEYEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/149655
description abstractThis recommended practice provides the recommended procedures, methods, and documentation for commissioning and integrated testing of active and passive fire protection and life safety systems and their interconnections with other building systems.
Special emphasis should be placed on the phrase "recommended procedures, methods, and documentation." The recommendations in this document provide a framework for commissioning and integrated testing. Although the actual commissioning of systems might not be the same for two different buildings, it should follow the same process. Similarly, the actual integrated testing of two systems in one building might not be the same as integrated testing in a second building for a variety of reasons. However, the process that is followed, as noted in NFPA 3, should remain the same.
Purpose
The purpose of this recommended practice is to describe the commissioning process and integrated testing that will ensure fire protection and life safety systems perform in conformity with the design intent.
A.1.2 System commissioning and integrated testing is critical to ascertain that systems are installed and function in accordance with the BOD and OPR and that testing is documented. It is not the intent of this recommended practice to supplant the existing requirements of other codes and standards, but this recommended practice can provide the appropriate guidance for a specific system or component where testing is not otherwise addressed. Such guidance should be developed by the fire protection and life safety commissioning team.
NFPA 3 has been developed as a fi rst step to address the concern of both the commissioning industry and regulatory agencies that a gap exists between the individual installation standards. An individual installation standard provides design, installation, and test requirements for a specifi c system. NFPA 3 bridges the gap between the individual standards to help ensure that fi re protection and life safety systems are designed, installed, tested, and verifi ed as a whole.
Commissioning is a process and not an event. This process begins at the planning phase of a project and continues through design, construction, and occupancy. NFPA 3 provides the framework for the Cx process relative to fire protection and life safety systems. The requirements for testing or verification of an individual system are found in the appropriate installation standard. The framework for testing and verification of integrated systems is found in NFPA 3. The specific procedures to be followed should be developed by the commissioning team, using the framework provided in NFPA 3.
languageEnglish
titleNFPA 3Hnum
titleCommissioning and Integrated System Testing Handbooken
typestandard
page321
statusActive
treeNFPA - (NFPA) - National Fluid Power Association:;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian