• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0092

Lessons Learned - Spent Booster Segment Handling Operation

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
During forward center segment on-load to rail car for transport to the furbishment facility, the segment began to slide out of the confines of the handling sling. Approximately 90% of the segment was suspended 10' to 15' feet above the rail car when the aft end of the segment slipped out of the sling, coming to rest on the rail car. The forward end of the segment stayed suspended approximately 10' above the rail car. No damage to the segment was noted and the rail car received only three scratches by the handling ring. The instability of the segment is due to the difficulty in determining its center of gravity.
URI: http://yse.yabesh.ir/std/handle/yse/149812
Subject: Flight Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.97Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0092

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:26:41Z
date available2017-09-04T17:26:41Z
date copyright07/28/1992
date issued1992
identifier otherCKYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/149812
description abstractDescription of Driving Event:
During forward center segment on-load to rail car for transport to the furbishment facility, the segment began to slide out of the confines of the handling sling. Approximately 90% of the segment was suspended 10' to 15' feet above the rail car when the aft end of the segment slipped out of the sling, coming to rest on the rail car. The forward end of the segment stayed suspended approximately 10' above the rail car. No damage to the segment was noted and the rail car received only three scratches by the handling ring. The instability of the segment is due to the difficulty in determining its center of gravity.
languageEnglish
titleNASA-LLIS-0092num
titleLessons Learned - Spent Booster Segment Handling Operationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFlight Equipment
subject keywordsFlight Operations
subject keywordsLaunch Process
subject keywordsLaunch Vehicle
subject keywordsLifting Devices
subject keywordsPressure Vessels
subject keywordsTransportation
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian