• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1338

Lessons Learned - Stennis Space Center Near-Miss/Ground Support Equipment

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2002

Abstract: Description of Driving Event:
On Monday, April 15, 2002 at approximately 5:45 PM the following incident occurred on the Stennis Space Center A1 test stand, level 5 upper engine work deck.
Subsequent to the removal and replacement of a High Pressure Fuel Pump the upper engine deck extension piece was rolled away from the main upper engine deck with the pump lifting/handling device still on the upper engine deck extension piece. The pump lifting device fell off the upper engine deck pinning a quality inspector between it and the upper engine deck handrail. The arm of the pump lifting/handling device was moved enough for the employee to be moved away and the deck was cleared. The device was secured in the as-rested position and the deck was cordoned off. The employee was able to walk on his own to inside the test stand. The employee was transported to a local hospital for an examination as a precaution. Photographs were taken of the area and equipment involved (contact Michael McDaniel, 228-688-2233).
An investigation/preventive action team was formed by management on the morning of Tuesday, April 16, 2002 to investigate, find the root cause, and make corrective action recommendations.
The A1 test stand had been recently reconfigured from a previous test program to a different test program after a 5 year period. The test team had moved from the A2 test stand to the A1 test stand. The test team did not feel this was a factor due to the similarities between the two test stands. The normal configuration for all pump removals is to use a roll-around work deck extension piece secured to the main work deck via turnbuckles.
URI: http://yse.yabesh.ir/std/handle/yse/156025
Subject: Ground Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.39Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1338

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:33:04Z
date available2017-09-04T17:33:04Z
date copyright04/15/2002
date issued2002
identifier otherDBWEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/156025
description abstractDescription of Driving Event:
On Monday, April 15, 2002 at approximately 5:45 PM the following incident occurred on the Stennis Space Center A1 test stand, level 5 upper engine work deck.
Subsequent to the removal and replacement of a High Pressure Fuel Pump the upper engine deck extension piece was rolled away from the main upper engine deck with the pump lifting/handling device still on the upper engine deck extension piece. The pump lifting device fell off the upper engine deck pinning a quality inspector between it and the upper engine deck handrail. The arm of the pump lifting/handling device was moved enough for the employee to be moved away and the deck was cleared. The device was secured in the as-rested position and the deck was cordoned off. The employee was able to walk on his own to inside the test stand. The employee was transported to a local hospital for an examination as a precaution. Photographs were taken of the area and equipment involved (contact Michael McDaniel, 228-688-2233).
An investigation/preventive action team was formed by management on the morning of Tuesday, April 16, 2002 to investigate, find the root cause, and make corrective action recommendations.
The A1 test stand had been recently reconfigured from a previous test program to a different test program after a 5 year period. The test team had moved from the A2 test stand to the A1 test stand. The test team did not feel this was a factor due to the similarities between the two test stands. The normal configuration for all pump removals is to use a roll-around work deck extension piece secured to the main work deck via turnbuckles.
languageEnglish
titleNASA-LLIS-1338num
titleLessons Learned - Stennis Space Center Near-Miss/Ground Support Equipmenten
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2002
contenttypefulltext
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHuman Factors
subject keywordsOccupational Health
subject keywordsPolicy & Planning
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian