• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0862

Lessons Learned – 3.5-Foot Hypersonic Wind Tunnel Ceramic Bed Matrix Heater Mishap

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2000

Abstract: Description of Driving Event:
Test personnel from the 3.5-foot Hypersonic Wind Tunnel facility, supported by personnel from the project phase 3 contractor, were conducting blowdown tests as a part of the Integrated Systems Testing (IST). The tests were being done to certify the operational status of the facility following a construction of facilities project for rehabilitation of the facility. The mishap occurred seconds after the start of the 5th run of the day, at approximately 10:00 a.m. Four previous blowdown tests had been completed on that day without incident.
URI: http://yse.yabesh.ir/std/handle/yse/158254
Subject: Aircraft
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.87Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0862

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:35:21Z
date available2017-09-04T17:35:21Z
date copyright05/22/2000
date issued2000
identifier otherDHTEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/158254
description abstractDescription of Driving Event:
Test personnel from the 3.5-foot Hypersonic Wind Tunnel facility, supported by personnel from the project phase 3 contractor, were conducting blowdown tests as a part of the Integrated Systems Testing (IST). The tests were being done to certify the operational status of the facility following a construction of facilities project for rehabilitation of the facility. The mishap occurred seconds after the start of the 5th run of the day, at approximately 10:00 a.m. Four previous blowdown tests had been completed on that day without incident.
languageEnglish
titleNASA-LLIS-0862num
titleLessons Learned – 3.5-Foot Hypersonic Wind Tunnel Ceramic Bed Matrix Heater Mishapen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsAircraft
subject keywordsGround Equipment
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian