NASA-LLIS-0862
Lessons Learned – 3.5-Foot Hypersonic Wind Tunnel Ceramic Bed Matrix Heater Mishap
Year: 2000
Abstract: Description of Driving Event:
Test personnel from the 3.5-foot Hypersonic Wind Tunnel facility, supported by personnel from the project phase 3 contractor, were conducting blowdown tests as a part of the Integrated Systems Testing (IST). The tests were being done to certify the operational status of the facility following a construction of facilities project for rehabilitation of the facility. The mishap occurred seconds after the start of the 5th run of the day, at approximately 10:00 a.m. Four previous blowdown tests had been completed on that day without incident.
Test personnel from the 3.5-foot Hypersonic Wind Tunnel facility, supported by personnel from the project phase 3 contractor, were conducting blowdown tests as a part of the Integrated Systems Testing (IST). The tests were being done to certify the operational status of the facility following a construction of facilities project for rehabilitation of the facility. The mishap occurred seconds after the start of the 5th run of the day, at approximately 10:00 a.m. Four previous blowdown tests had been completed on that day without incident.
Subject: Aircraft
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:35:21Z | |
| date available | 2017-09-04T17:35:21Z | |
| date copyright | 05/22/2000 | |
| date issued | 2000 | |
| identifier other | DHTEQCAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std/handle/yse/158254 | |
| description abstract | Description of Driving Event: Test personnel from the 3.5-foot Hypersonic Wind Tunnel facility, supported by personnel from the project phase 3 contractor, were conducting blowdown tests as a part of the Integrated Systems Testing (IST). The tests were being done to certify the operational status of the facility following a construction of facilities project for rehabilitation of the facility. The mishap occurred seconds after the start of the 5th run of the day, at approximately 10:00 a.m. Four previous blowdown tests had been completed on that day without incident. | |
| language | English | |
| title | NASA-LLIS-0862 | num |
| title | Lessons Learned – 3.5-Foot Hypersonic Wind Tunnel Ceramic Bed Matrix Heater Mishap | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2000 | |
| contenttype | fulltext | |
| subject keywords | Aircraft | |
| subject keywords | Ground Equipment | |
| subject keywords | Test Facility |