• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5183

Flight Termination System (FTS) Safe and Arm (S&A) Device Monitoring Capability

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: Late in the Constellation Program, a trade study was performed to assess ordnance connects and closeouts in the Vehicle Assembly Building (VAB) at the Kennedy Space Center. This trade study discussed the need for ground system upgrades in the processing flow. One of these upgrades required establishing a monitoring capability for a Flight Termination System (FTS) Safe and Arm (S&A) device when power is removed during vehicle rollout. This operational upgrade will require process modification to ground and flight subsystems.
URI: http://yse.yabesh.ir/std/handle/yse/159623
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (57.98Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5183

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:36:47Z
date available2017-09-04T17:36:47Z
date copyright08/22/2012
date issued2012
identifier otherDLIKYEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/159623
description abstractLate in the Constellation Program, a trade study was performed to assess ordnance connects and closeouts in the Vehicle Assembly Building (VAB) at the Kennedy Space Center. This trade study discussed the need for ground system upgrades in the processing flow. One of these upgrades required establishing a monitoring capability for a Flight Termination System (FTS) Safe and Arm (S&A) device when power is removed during vehicle rollout. This operational upgrade will require process modification to ground and flight subsystems.
languageEnglish
titleNASA-LLIS-5183num
titleFlight Termination System (FTS) Safe and Arm (S&A) Device Monitoring Capabilityen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian