• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-2916

Lessons Learned – Avionics Line Replaceable Unit Built in Tests

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: Abstract:
The Space Shuttle Program Orbiter Avionics Line Replaceable Unit's (LRU) were designed with limited or no diagnostic capability. The lack of fault isolation capability resulted in flight processing schedule impacts and collateral damage to flight hardware. New LRU designs need to provide an Integrated Built In Test that will verify the LRU internal components and external outputs of the LRU are functioning nominally.
URI: http://yse.yabesh.ir/std/handle/yse/161656
Subject: Acquisition / procurement strategy and planning
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (72.98Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-2916

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:38:42Z
date available2017-09-04T17:38:42Z
date copyright05/10/2010
date issued2010
identifier otherDQQIUCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/161656
description abstractAbstract:
The Space Shuttle Program Orbiter Avionics Line Replaceable Unit's (LRU) were designed with limited or no diagnostic capability. The lack of fault isolation capability resulted in flight processing schedule impacts and collateral damage to flight hardware. New LRU designs need to provide an Integrated Built In Test that will verify the LRU internal components and external outputs of the LRU are functioning nominally.
languageEnglish
titleNASA-LLIS-2916num
titleLessons Learned – Avionics Line Replaceable Unit Built in Testsen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsAcquisition / procurement strategy and planning
subject keywordsEngineering design and project processes and standards
subject keywordsGround processing and manifesting
subject keywordsGround support systems
subject keywordsHuman factors planning
subject keywordsLaunch support systems
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian