• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0115

Lessons Learned - Payload Bay Door (PBD) Opening/Closing Operations

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
During OMI V9023.F operations, the L/H payload bay door was noticed to have a slight upward bend in it due to excessive force placed on it through the L/H AFT PBD support jack. The aft half of the L/H PBD was raised eight to ten inches higher than the position of the PBD forward segment. An interference problem occurs when trying to insert/remove the "C" frame support hook from the support jack dowel. The interference problem requires the use of more than one technician to force the "C" frame support hook on and off the support jack dowel.
URI: http://yse.yabesh.ir/std/handle/yse/163309
Subject: Flight Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.01Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0115

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:40:16Z
date available2017-09-04T17:40:16Z
date copyright07/27/1992
date issued1992
identifier otherDUYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/163309
description abstractDescription of Driving Event:
During OMI V9023.F operations, the L/H payload bay door was noticed to have a slight upward bend in it due to excessive force placed on it through the L/H AFT PBD support jack. The aft half of the L/H PBD was raised eight to ten inches higher than the position of the PBD forward segment. An interference problem occurs when trying to insert/remove the "C" frame support hook from the support jack dowel. The interference problem requires the use of more than one technician to force the "C" frame support hook on and off the support jack dowel.
languageEnglish
titleNASA-LLIS-0115num
titleLessons Learned - Payload Bay Door (PBD) Opening/Closing Operationsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFlight Equipment
subject keywordsGround Operations
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian