• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-2476

Lessons Learned – Place Flight Scripts Under Configuration Management Prior to ORT

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: Abstract:
When flight scripts developed independently by project personnel are not placed under configuration control early enough in flight software development, multiple versions of the scripts tend to proliferate and cause confusion and delays. The MER, Juno, and GRAIL projects demonstrated the utility of placing flight scripts under change control prior to ORT.
URI: http://yse.yabesh.ir/std/handle/yse/177865
Subject: Additional Categories.Computers
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (30.35Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-2476

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:54:45Z
date available2017-09-04T17:54:45Z
date copyright03/23/2010
date issued2010
identifier otherFIAIRCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/177865
description abstractAbstract:
When flight scripts developed independently by project personnel are not placed under configuration control early enough in flight software development, multiple versions of the scripts tend to proliferate and cause confusion and delays. The MER, Juno, and GRAIL projects demonstrated the utility of placing flight scripts under change control prior to ORT.
languageEnglish
titleNASA-LLIS-2476num
titleLessons Learned – Place Flight Scripts Under Configuration Management Prior to ORTen
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
subject keywordsAdditional Categories.Computers
subject keywordsAdditional Categories.Configuration Management
subject keywordsAdditional Categories.Flight Operations
subject keywordsAdditional Categories.Software
subject keywordsAdditional Categories.Spacecraft
subject keywordsAdditional Categories.Standard
subject keywordsAdditional Categories.Test & Verification
subject keywordsEngineering Design (Phase C/D).Software Engineering
subject keywordsIntegration and Testing
subject keywordsMission Operations and Ground Support Systems.Mission operations systems
subject keywordsMissions and Systems Requirements Definition.Configuration control and data management
subject keywordsProgram Management.Configuration and data management
subject keywordsProgram Management.Contractor relationships
subject keywordsSafety and Mission Assurance.Configuration Change Control
subject keywordsSystems Engineering and Analysis.Engineering design and project processes and standards
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian