• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • NECA - National Electrical Contractors Association
  • View Item
  •   YSE
  • Industrial Standards
  • NECA - National Electrical Contractors Association
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NECA NEIS 402

Standard for Installing and Maintaining Motor Control Centers

Organization:
NECA - National Electrical Contractors Association
Year: 2007

Abstract: Regulatory and Other Requirements
a) All information in this publication is intended to conform to the National Electrical Code
(ANSI/NFPA 70). Installers should always follow the NEC, applicable state and local codes, manufacturer's instructions, and contract documents.
b) Only qualified persons familiar with the construction and installation of motor control centers should perform the work described in this publication. It is recommended that all work be performed in accordance with NFPA 70E, Standard for Electrical Safety in the Workplace.
c) General requirements for installing electrical products and systems are described in NECA 1, Standard Practices for Good Workmanship in Electrical Construction (ANSI). Other National Electrical Installation Standards provide additional guidance for installing particular types of electrical products and systems. A complete list of NEIS is provided in Annex A.
URI: http://yse.yabesh.ir/std;query=autho162sear3FCDCAC4261598F1EFDEC014A/handle/yse/178099
Collections :
  • NECA - National Electrical Contractors Association
  • Download PDF : (483.6Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NECA NEIS 402

Show full item record

contributor authorNECA - National Electrical Contractors Association
date accessioned2017-09-04T17:54:58Z
date available2017-09-04T17:54:58Z
date copyright01/01/2007
date issued2007
identifier otherFIQTACAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho162sear3FCDCAC4261598F1EFDEC014A/handle/yse/178099
description abstractRegulatory and Other Requirements
a) All information in this publication is intended to conform to the National Electrical Code
(ANSI/NFPA 70). Installers should always follow the NEC, applicable state and local codes, manufacturer's instructions, and contract documents.
b) Only qualified persons familiar with the construction and installation of motor control centers should perform the work described in this publication. It is recommended that all work be performed in accordance with NFPA 70E, Standard for Electrical Safety in the Workplace.
c) General requirements for installing electrical products and systems are described in NECA 1, Standard Practices for Good Workmanship in Electrical Construction (ANSI). Other National Electrical Installation Standards provide additional guidance for installing particular types of electrical products and systems. A complete list of NEIS is provided in Annex A.
languageEnglish
titleNECA NEIS 402num
titleStandard for Installing and Maintaining Motor Control Centersen
typestandard
page46
statusActive
treeNECA - National Electrical Contractors Association:;2007
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian