ACI 533.1R
Design Responsibility for Architectural Precast-Concrete Projects
Organization:
ACI - American Concrete Institute
Year: 2002
Abstract: INTRODUCTION
Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents.
Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents.
Subject: Architect
Collections
:
Show full item record
| contributor author | ACI - American Concrete Institute | |
| date accessioned | 2017-09-04T15:09:15Z | |
| date available | 2017-09-04T15:09:15Z | |
| date copyright | 09/01/2002 | |
| date issued | 2002 | |
| identifier other | LNKUABAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std/handle/yse/7249 | |
| description abstract | INTRODUCTION Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents. | |
| language | English | |
| title | ACI 533.1R | num |
| title | Design Responsibility for Architectural Precast-Concrete Projects | en |
| type | standard | |
| page | 10 | |
| status | Active | |
| tree | ACI - American Concrete Institute:;2002 | |
| contenttype | fulltext | |
| subject keywords | Architect | |
| subject keywords | architectural concrete | |
| subject keywords | construction | |
| subject keywords | design | |
| subject keywords | design responsibility | |
| subject keywords | general contractor | |
| subject keywords | precast concrete |

درباره ما