• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ACI 533.1R

Design Responsibility for Architectural Precast-Concrete Projects

Organization:
ACI - American Concrete Institute
Year: 2002

Abstract: INTRODUCTION
Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents.
URI: http://yse.yabesh.ir/std/handle/yse/7249
Subject: Architect
Collections :
  • ACI - American Concrete Institute
  • Download PDF : (964.6Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ACI 533.1R

Show full item record

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T15:09:15Z
date available2017-09-04T15:09:15Z
date copyright09/01/2002
date issued2002
identifier otherLNKUABAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/7249
description abstractINTRODUCTION
Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents.
languageEnglish
titleACI 533.1Rnum
titleDesign Responsibility for Architectural Precast-Concrete Projectsen
typestandard
page10
statusActive
treeACI - American Concrete Institute:;2002
contenttypefulltext
subject keywordsArchitect
subject keywordsarchitectural concrete
subject keywordsconstruction
subject keywordsdesign
subject keywordsdesign responsibility
subject keywordsgeneral contractor
subject keywordsprecast concrete
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian