Show simple item record

Specification for the Construction of Drilled Piers

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T16:12:44Z
date available2017-09-04T16:12:44Z
date copyright01/01/2001
date issued2001
identifier otherSPQFUAAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/75992
description abstractThis Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. (750 mm) diameter and larger. The Contractor shall submit proposed installation methods to the Owner's Representative-Geotechnical Engineer. Methods compatible with the design intent, as determined by the Owner's Representative-Geotechnical Engineer, will be accepted. Methods that are not compatible with the design intent will be rejected.
The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution.
languageEnglish
titleACI 336.1num
titleSpecification for the Construction of Drilled Piersen
typestandard
page22
statusActive
treeACI - American Concrete Institute:;2001
contenttypefulltext
subject keywordsbored pile
subject keywordscaisson
subject keywordsconcrete
subject keywordsdrilled pier
subject keywordsfoundation
subject keywordsplacing
subject keywordsreinforced concrete
subject keywordsreinforcement
subject keywordsslurry
subject keywordssoil
subject keywordsspecification
subject keywordstest
subject keywordstolerance.


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record