• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ACI 336.1

Specification for the Construction of Drilled Piers

Organization:
ACI - American Concrete Institute
Year: 2001

Abstract: This Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. (750 mm) diameter and larger. The Contractor shall submit proposed installation methods to the Owner's Representative-Geotechnical Engineer. Methods compatible with the design intent, as determined by the Owner's Representative-Geotechnical Engineer, will be accepted. Methods that are not compatible with the design intent will be rejected.
The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution.
URI: http://yse.yabesh.ir/std/handle/yse/75992
Subject: bored pile
Collections :
  • ACI - American Concrete Institute
  • Download PDF : (181.2Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ACI 336.1

Show full item record

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T16:12:44Z
date available2017-09-04T16:12:44Z
date copyright01/01/2001
date issued2001
identifier otherSPQFUAAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/75992
description abstractThis Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. (750 mm) diameter and larger. The Contractor shall submit proposed installation methods to the Owner's Representative-Geotechnical Engineer. Methods compatible with the design intent, as determined by the Owner's Representative-Geotechnical Engineer, will be accepted. Methods that are not compatible with the design intent will be rejected.
The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution.
languageEnglish
titleACI 336.1num
titleSpecification for the Construction of Drilled Piersen
typestandard
page22
statusActive
treeACI - American Concrete Institute:;2001
contenttypefulltext
subject keywordsbored pile
subject keywordscaisson
subject keywordsconcrete
subject keywordsdrilled pier
subject keywordsfoundation
subject keywordsplacing
subject keywordsreinforced concrete
subject keywordsreinforcement
subject keywordsslurry
subject keywordssoil
subject keywordsspecification
subject keywordstest
subject keywordstolerance.
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian