ACI 336.1
Specification for the Construction of Drilled Piers
Organization:
ACI - American Concrete Institute
Year: 2001
Abstract: This Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. (750 mm) diameter and larger. The Contractor shall submit proposed installation methods to the Owner's Representative-Geotechnical Engineer. Methods compatible with the design intent, as determined by the Owner's Representative-Geotechnical Engineer, will be accepted. Methods that are not compatible with the design intent will be rejected.
The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution.
The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution.
Subject: bored pile
Collections
:
Show full item record
contributor author | ACI - American Concrete Institute | |
date accessioned | 2017-09-04T16:12:44Z | |
date available | 2017-09-04T16:12:44Z | |
date copyright | 01/01/2001 | |
date issued | 2001 | |
identifier other | SPQFUAAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std/handle/yse/75992 | |
description abstract | This Reference Specification covers requirements for drilled pier construction and applies to drilled piers of 30 in. (750 mm) diameter and larger. The Contractor shall submit proposed installation methods to the Owner's Representative-Geotechnical Engineer. Methods compatible with the design intent, as determined by the Owner's Representative-Geotechnical Engineer, will be accepted. Methods that are not compatible with the design intent will be rejected. The provisions of this Specification shall govern, unless otherwise specified in the Contract Documents. In case of conflicting requirements, the Contract Documents shall govern. Conflicting requirements shall be submitted to the Owner's Representative for resolution. | |
language | English | |
title | ACI 336.1 | num |
title | Specification for the Construction of Drilled Piers | en |
type | standard | |
page | 22 | |
status | Active | |
tree | ACI - American Concrete Institute:;2001 | |
contenttype | fulltext | |
subject keywords | bored pile | |
subject keywords | caisson | |
subject keywords | concrete | |
subject keywords | drilled pier | |
subject keywords | foundation | |
subject keywords | placing | |
subject keywords | reinforced concrete | |
subject keywords | reinforcement | |
subject keywords | slurry | |
subject keywords | soil | |
subject keywords | specification | |
subject keywords | test | |
subject keywords | tolerance. |